![Kongsberg Simrad MF90 Скачать руководство пользователя страница 406](http://html1.mh-extra.com/html/kongsberg/simrad-mf90/simrad-mf90_installation-manual_1992582406.webp)
404
476671/B
Assigning functions to the rotary switches on
the Operating Panel .................................. 308
sonar room ................................................ 67
BITE (Built-In Test Equipment)
testing the receiver and transmitter channels
with the BITE B-Scan functionality ............... 319
testing the receiver and transmitter
channels................................................ 319
blind flange
outline dimensions............................... 398–399
backup ................................................... 333
Bottom reverberation....................................... 74
bridge
cable plan ............................................... 146
bridge units .................................................. 56
cable lengths.............................................. 57
maximum distance....................................... 57
testing the receiver and transmitter channels
with the BITE B-Scan functionality ............... 319
Setting up input from buoys, fish aggregating
devices and other external objects ................. 294
C
AC mains power cable (3-phase) to the Motor
Control Unit........................................... 176
Ethernet cable from Transceiver Unit to Motor
Control Unit........................................... 175
Ethernet cable RJ45 ............................. 173, 181
RS-232 serial line connection using five
wires.................................................... 166
RS-232 serial line connection using three
wires.................................................... 165
RS-232 used as synchronization trigger (input
or output) .............................................. 167
RS-422 serial line connection using five
wires.................................................... 168
sonar room .............................................. 150
prerequisites ............................................ 155
sonar room .............................................. 157
topside ................................................... 155
cable lengths................................................. 56
bridge units ............................................... 57
comments ............................................... 151
bridge .................................................... 146
comments ............................................... 151
sonar room .............................................. 150
topside ................................................... 146
Finalizing the cable connections..................... 224
installation (sonar room) .............................. 157
installation (topside)................................... 155
Making sure that all MF90 system cables are
properly connected ................................... 199
requirements .............................................. 36
sonar room .............................................. 151
topside ................................................... 148
CAT5
Ethernet cable .................................... 173, 181
CAT5E
Ethernet cable .................................... 173, 181
acoustic noise............................................. 71
hoisting (transducer)................................... 216
lowering (transducer).................................. 216
Checking the 3-phase connection for correct
rotation.................................................... 212
Checking the hosting motor’s 3-phase AC
connections............................................... 208
Checking the operation of the Hoisting and
Lowering contactors .................................... 214
Checking the transducer lowering and hoisting
functionality.............................................. 216
Choosing the best location for the Operating
Panel ........................................................ 60
approval ................................................... 38
approval (installation drawings) .............. 11,
classification society approval
requirements .............................................. 38
cable lists................................................ 151
cable plan ............................................... 151
description .............................................. 144
sonar room .............................................. 151
topside ................................................... 148
setting up the parameters ............................. 278
sonar room ................................................ 66
description ................................................ 29
required item ............................................. 29
scope of supply........................................... 29
requirements .............................................. 37
display ................................................... 361
Operating Panel .......................................... 60
technical specifications................................ 361
computer .................................................. 59
Hull Unit ................................................ 362
Operating Panel (Mk2)................................ 361
Operating Panel (Mk3)................................ 361
Processor Unit............................................ 59
transceiver .............................................. 362
Transceiver Unit ....................................... 362
audio output ............................................ 171
Choosing the best location for the Processor
Unit....................................................... 59
Compass Safe Distance (CSD)......................... 59
connectors............................................... 159
description ................................................ 21
installation .............................................. 130
introduction ............................................... 21
Moxa CP114EL-I Serial line adapter ............... 169
Simrad MF90 Installation Manual
Содержание Simrad MF90
Страница 1: ...kongsberg com simrad Simrad MF90 INSTALLATION MANUAL...
Страница 2: ......
Страница 21: ...476671 B 19 Related topics Simrad MF90 page 13 Simrad MF90...
Страница 353: ...476671 B 351 Number of individual elements 480 Related topics Technical specifications page 346 Technical specifications...
Страница 369: ...476671 B 367 Drawing file...
Страница 372: ...370 476671 B Simrad MF90 Installation Manual...
Страница 373: ...476671 B 371 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 375: ...476671 B 373 Drawing file...
Страница 378: ...376 476671 B Simrad MF90 Installation Manual...
Страница 379: ...476671 B 377 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 384: ...382 476671 B Simrad MF90 Installation Manual...
Страница 385: ...476671 B 383 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 387: ...476671 B 385 Drawing file...
Страница 388: ...386 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 390: ...388 476671 B Simrad MF90 Installation Manual...
Страница 391: ...476671 B 389 Related topics Installing the hull unit page 99 Drawing file page 364 Drawing file...
Страница 393: ...476671 B 391 Drawing file...
Страница 394: ...392 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 396: ...394 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 398: ...396 476671 B Simrad MF90 Installation Manual...
Страница 399: ...476671 B 397 Related topics Installing the hull unit page 99 Drawing file page 364 Drawing file...
Страница 421: ......
Страница 422: ...2022 Kongsberg Maritime ISBN 978 82 8066 240 8...
Страница 423: ......
Страница 425: ......
Страница 426: ...Installation Manual Simrad MF90...