476671/B
7
Visual inspection of the display................................................................................. 189
Visual inspection of the Processor Unit .................................................................... 191
Visual inspection of the Operating Panel .................................................................. 193
Visual inspection of the Transceiver Unit ................................................................. 194
Visual inspection of the hull unit............................................................................... 196
Checking the environmental conditions in the sonar room ....................................... 198
Making sure that all MF90 system cables are properly connected ........................... 199
Hull Unit description ................................................................................................. 201
Hull unit familiarization (MF90)............................................................................... 204
Hull unit familiarization (MF94)............................................................................... 205
Motor Control Unit familiarization ........................................................................... 206
Initial safety check of the Motor Control Unit .......................................................... 207
Checking the hosting motor’s 3-phase AC connections............................................ 208
Connecting the 3-phase AC power to the Motor Control Unit ................................. 210
Venting the transducer shaft sleeve ............................................................................211
Checking the 3-phase connection for correct rotation............................................... 212
Checking the operation of the Hoisting and Lowering contactors ............................ 214
Checking the transducer lowering and hoisting functionality................................... 216
Summary of initial start-up........................................................................................ 219
Making sure that the operating power is correct ....................................................... 220
Making sure that the transducer cannot be accidentally lowered.............................. 222
Connecting the transducer cables to the Transceiver Unit ........................................ 223
Finalizing the cable connections ............................................................................... 224
Installing the operating software ............................................................................... 224
Obtaining and installing a software license for additional functionality................... 226
Selecting hull unit...................................................................................................... 228
Defining the middle position of the transducer ......................................................... 229
Setting up the Operating Panel (Mk2)....................................................................... 231
Using more than one Operating Panel to control the sonar (Mk2) ........................... 235
Using a single Operating Panel to control more than one sonar (Mk2) .................... 239
Turning on the entire system: Introduction ............................................................... 243
Turning on the entire system: Preparations............................................................... 244
Installation Manual
Содержание Simrad MF90
Страница 1: ...kongsberg com simrad Simrad MF90 INSTALLATION MANUAL...
Страница 2: ......
Страница 21: ...476671 B 19 Related topics Simrad MF90 page 13 Simrad MF90...
Страница 353: ...476671 B 351 Number of individual elements 480 Related topics Technical specifications page 346 Technical specifications...
Страница 369: ...476671 B 367 Drawing file...
Страница 372: ...370 476671 B Simrad MF90 Installation Manual...
Страница 373: ...476671 B 371 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 375: ...476671 B 373 Drawing file...
Страница 378: ...376 476671 B Simrad MF90 Installation Manual...
Страница 379: ...476671 B 377 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 384: ...382 476671 B Simrad MF90 Installation Manual...
Страница 385: ...476671 B 383 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 387: ...476671 B 385 Drawing file...
Страница 388: ...386 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 390: ...388 476671 B Simrad MF90 Installation Manual...
Страница 391: ...476671 B 389 Related topics Installing the hull unit page 99 Drawing file page 364 Drawing file...
Страница 393: ...476671 B 391 Drawing file...
Страница 394: ...392 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 396: ...394 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 398: ...396 476671 B Simrad MF90 Installation Manual...
Страница 399: ...476671 B 397 Related topics Installing the hull unit page 99 Drawing file page 364 Drawing file...
Страница 421: ......
Страница 422: ...2022 Kongsberg Maritime ISBN 978 82 8066 240 8...
Страница 423: ......
Страница 425: ......
Страница 426: ...Installation Manual Simrad MF90...