208
476671/B
Checking the hosting motor’s 3-phase AC connections
The electric hoisting motor on the hull unit requires 3-phase AC power for operation. The
physical connections to the motor are made inside the terminal box on the motor. To avoid
serious damage to the hoisting motor, and to ensure that the motor operates properly,
you must verify that the electrical connections are made in accordance with the supplied
3-phase AC voltage.
Prerequisites
• The MF90 system is turned off.
• The circuit breaker for the 3-phase AC power is closed. AC power is connected.
• All cable connections are made.
You must be equipped with a standard set of tools. This tool set must comprise the normal
tools for electronic and electromechanical tasks. This includes different screwdriver types,
pliers, spanners, a cable stripper, a soldering iron, etc. Each tool must be provided in various
sizes. We recommend that all tools are demagnetized to protect your equipment.
Context
The hoisting motor is mounted vertically at the top of the gantry. The upper part of the motor
is fitted to a gear box. This gear box is connected to the hoisting spindle using a timing belt.
The electrical connections to the hoisting motor are made inside the terminal box. The
3-phase supply voltage for the motor can be 230, 380 or 440 VAC at 50 or 60 Hz.
WARNING
High voltages are used. This equipment must be serviced only by qualified personnel
familiar with high-voltage equipment and the potential hazards involved. Failure to
observe this precaution could result in bodily injury.
Procedure
1
To disconnect power, disengage the circuit breaker for the 3-phase AC voltage.
2
Remove the cover on the power connections terminal box on the hoisting motor.
3
Verify that the electrical connections to the hoisting motor are made in accordance
with the supplied 3-phase AC voltage.
Refer to the illustration.
Simrad MF90 Installation Manual
Содержание Simrad MF90
Страница 1: ...kongsberg com simrad Simrad MF90 INSTALLATION MANUAL...
Страница 2: ......
Страница 21: ...476671 B 19 Related topics Simrad MF90 page 13 Simrad MF90...
Страница 353: ...476671 B 351 Number of individual elements 480 Related topics Technical specifications page 346 Technical specifications...
Страница 369: ...476671 B 367 Drawing file...
Страница 372: ...370 476671 B Simrad MF90 Installation Manual...
Страница 373: ...476671 B 371 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 375: ...476671 B 373 Drawing file...
Страница 378: ...376 476671 B Simrad MF90 Installation Manual...
Страница 379: ...476671 B 377 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 384: ...382 476671 B Simrad MF90 Installation Manual...
Страница 385: ...476671 B 383 Related topics Installing the MF90 system hardware units page 126 Drawing file page 364 Drawing file...
Страница 387: ...476671 B 385 Drawing file...
Страница 388: ...386 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 390: ...388 476671 B Simrad MF90 Installation Manual...
Страница 391: ...476671 B 389 Related topics Installing the hull unit page 99 Drawing file page 364 Drawing file...
Страница 393: ...476671 B 391 Drawing file...
Страница 394: ...392 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 396: ...394 476671 B Related topics Installing the hull unit page 99 Drawing file page 364 Simrad MF90 Installation Manual...
Страница 398: ...396 476671 B Simrad MF90 Installation Manual...
Страница 399: ...476671 B 397 Related topics Installing the hull unit page 99 Drawing file page 364 Drawing file...
Страница 421: ......
Страница 422: ...2022 Kongsberg Maritime ISBN 978 82 8066 240 8...
Страница 423: ......
Страница 425: ......
Страница 426: ...Installation Manual Simrad MF90...