
296
416739/A
install the Wide Band Transceiver
(WBT) ................................................. 65, 67
install transceiver channels .............................. 174
lift units and transportation boxes ...................... 280
make a noise/speed curve to determine vessel
noise....................................................... 239
measure noise in passive mode ......................... 224
obtain and install the software license ................. 168
prepare a cable for termination.......................... 148
restore correct scaling .................................... 178
secure and terminate a cable............................. 149
select measurement units ................................ 181
select menu language..................................... 180
set to work ................................................. 154
set up (summary).......................................... 164
set up depth output........................................ 208
set up synchronization.............................. 110, 215
set up the catch sensor interface ........................ 202
set up the GPS interface.................................. 196
set up the motion reference unit (MRU)
interface................................................... 206
set up the navigation sensor interface .................. 196
set up the trawl system interface........................ 204
splice the transducer cable............................... 102
synchronise using Auxiliary port ................. 113, 218
transport Kongsberg Maritime equipment............. 279
turn off ..................................................... 243
turn on ...................................................... 167
unpack a hydrophone..................................... 287
unpack a mechanical unit ................................ 285
unpack a sonar head ...................................... 287
unpack a transducer....................................... 287
unpack an electronic or electromechanical
unit ........................................................ 286
unpack standard parts and units......................... 284
use multi-diameter cable sealing........................ 150
verify that operational power is correct................ 156
verify the communication with the motion
reference unit (MRU) ................................... 235
verify the course gyro interface ......................... 229
verify the GPS interface ................................. 231
verify the gyro interface ................................. 229
verify the heading gyro interface ....................... 229
verify the navigation sensor interface .................. 231
verify the speed log interface............................ 233
visual inspection of units and transportation boxes
after arrival ............................................... 281
protruding objects.......................................... 47
requirements ............................................... 262
unpacking .................................................. 287
I
connecting a catch monitoring system ................. 202
connecting a trawl system ............................... 204
importing annotations on a communication
port ........................................................ 200
cable requirements........................................ 146
line socket.................................................. 117
system diagram............................................. 16
annotations................................................. 200
before you power up....................................... 12
if something breaks down ................................ 12
power off .................................................... 12
reminders.................................................... 12
switch off ................................................... 12
transducer handling........................................ 13
when not in use............................................. 12
when you are docking your vessel....................... 12
high voltage................................................. 32
online ........................................................ 10
support ...................................................... 38
setup (summary) .......................................... 164
transportation boxes ...................................... 281
units......................................................... 281
visual inspection of the computer....................... 160
visual inspection of the display ......................... 158
visual inspection of the Processor Unit ................ 160
visual inspection of the transceiver..................... 162
visual inspection of the Transceiver Unit.............. 162
in forward part of hull ..................................... 48
CEHW computer........................................... 72
computer .................................................... 74
display ................................................... 71, 76
drawings....................................................... 9
instructions ................................................... 9
overview .................................................... 42
power supply ............................................... 69
Processor Unit.............................................. 72
requirements for installation personnel ................. 45
software .................................................... 166
summary .................................................... 42
summary of transducer installation...................... 77
tasks ......................................................... 42
transceiver .............................................. 65, 67
transceiver channels ...................................... 174
Transceiver Unit ....................................... 65, 67
transducer (in user interface) ............................ 171
Wide Band Transceiver (WBT) ...................... 65, 67
installation requirements.................................. 36
about ........................................................ 271
approval ............................................ 9, 44, 271
creating ............................................. 9, 44, 271
Simrad ES80 Installation Manual
Содержание Simrad ES80
Страница 1: ...kongsberg com simrad Simrad ES80 INSTALLATION MANUAL ...
Страница 2: ......
Страница 25: ...416739 A 23 Related topics Scope of supply page 21 Simrad ES80 page 11 Simrad ES80 ...
Страница 278: ...276 416739 A 201575 Transducer connector assembly and wiring Simrad ES80 Installation Manual ...
Страница 309: ......
Страница 310: ... 2020 Kongsberg Maritime ISBN 978 82 8066 187 6 ...
Страница 311: ......
Страница 312: ...Installation Manual Simrad ES80 ...