Dry docking requirements
Whenever one or more transducers are mounted under the vessel’s hull, special
considerations must be made prior to dry docking.
Make sure that ample clearance is provided under the transducers when you are placing
the vessel in dry dock. Do not place supporting blocks or structures in the vicinity of the
transducers.
Note down the location of each transducer on the vessel’s docking plan.
Prior to dry docking, turn off the ES80. If necessary, disengage the circuit breaker. Label
the Processor Unit and/or the circuit breaker clearly to prevent anyone from accidentally
turning on the ES80.
Related topics
Installation requirements, page 33
Simrad ES80, page 11
Requirement for classification approval
Classification approval is required for the ES80 installation.
The transducer installation must be approved by the vessel’s national registry and
corresponding maritime authority and/or classification society. The shipowner and shipyard
doing the installation are responsible for obtaining and paying for such approval.
Related topics
Installation requirements, page 33
Simrad ES80, page 11
Simrad ES80 Installation Manual
Содержание Simrad ES80
Страница 1: ...kongsberg com simrad Simrad ES80 INSTALLATION MANUAL ...
Страница 2: ......
Страница 25: ...416739 A 23 Related topics Scope of supply page 21 Simrad ES80 page 11 Simrad ES80 ...
Страница 278: ...276 416739 A 201575 Transducer connector assembly and wiring Simrad ES80 Installation Manual ...
Страница 309: ......
Страница 310: ... 2020 Kongsberg Maritime ISBN 978 82 8066 187 6 ...
Страница 311: ......
Страница 312: ...Installation Manual Simrad ES80 ...