OPERATION
OPERATIONS AND CHECKS BEFORE STARTING ENGINE
181
OPERATION OF DOZER + OUTRIGGERS
REMARK
Ensure safety lock lever is lowered (UNLOCKED).
1.
Press switch (3) on right control lever to change from boom
operation to dozer/outrigger operation (attachment).The mon-
itor will now display symbol (12) indicating the dozer/outrigger
option has been selected
2.
Using monitor panel switches (16~20) select the desired
combination of dozer/outriggers required. A light will illumi-
nate next to the switch to confirm selection
3.
Right control lever (4) will now operate the dozer/outriggers
4.
To return right control lever to boom operation activate switch
(3). Symbol (12) will now disappear from the monitor panel
display
WARNING
When moving the machine, confirm that the chassis attach-
ment is raised.
PRECAUTIONS FOR USING THE DOZER
1.
When using the dozer blade as stabiliser.
Use the dozer blade in the same way as an outrigger. How-
ever, use it only on level ground so that uneven loads will not
be applied to the blade.
2.
When using the dozer blade with the upper structure facing
the rear of the undercarriage, the steering wheel acts in the
opposite direction to normal travel.
3.
Ensure that suspension lock system is fully free when
required for dozing operations. see "AUTOMATIC SUSPEN-
SION LOCK SWITCH (101)"
REMARK
Dozer blade is to be used only for stabilizing and light dozing.
16
17
19
20
18
16
Rear Left Outrigger / Blade
17
Front Left Outrigger / Blade
18
All Outriggers/Outrigger & Blade
19
Front Right Outrigger
20
Rear Right Outrigger
3
12
Right control lever
4
1
Lever forward
Attachment down
2
Lever back
Attachment up
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...