OPERATIONS AND CHECKS BEFORE STARTING ENGINE
OPERATION
166
2.
Lower the safety lock lever to the UNLOCK position, switch
OFF the control lever lock switch and raise the bucket from
the ground.
3.
Operate bucket control - right control lever, and arm control -
left control lever (slowly to move the bucket cylinder and arm
cylinder to the end of the stroke.
4.
Carry out bucket and arm operation for 5 minutes at full
stroke, alternating between bucket operation and arm opera-
tion at 30 second intervals.
If the swing lock switch (9) is set to the ON (actuated) position
and swing control lever is operated at full stroke, oil tempera-
ture rise can be increased quicker.
NOTICE
When the work equipment is retracted, take care that it
does not interfere with the machine body or ground.
LOCK
UNLOCK
Control
lever
lock switch
B
A
D
C
(A) Arm Out
(C) Bucket Curl
(B) Arm In
(D) Bucket Dump
A
B
9
Left
control
lever
A:
Left swing
B:
Right swing
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...