SERVICE PROCEDURE
MAINTENANCE
248
SERVICE PROCEDURE
INITIAL 250 HOURS SERVICE
Carry out the following maintenance only after the first 250
hours.
●
REPLACE FUEL FILTER CARTRIDGE
For details, see "REPLACE FUEL FILTER CARTRIDGE
(287)"
●
CHECK ENGINE VALVE CLEARANCE, ADJUST
For details, see "CHECK ENGINE VALVE CLEARANCE,
ADJUST (248)"
For details of the method of replacing or maintaining, see
the section on EVERY 500 HOURS and 2000 HOURS SER-
VICE.
●
CHANGE OIL IN TRANSMISSION, HUBS + AXLES.
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...