OPERATION
TRANSPORTATION
201
5.
Mount a shackle to boom pins and the counter weight. Hang
the wire rope.
6.
The length off the wire rope and the lifting angle must be as
shown in the figure on the right.
7.
When lifting, make sure that there is no change in the position
due to possible leakage in the hydraulic circuit on the boom
cylinder head side.
8.
When the machine leaves the ground, stop the machine and
make sure sufficiently that the machine is balanced.
Then, lift the machine slowly.
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...