SWITCHES
OPERATION
108
SWITCHES
1. Machine monitor
18. Horn
2. Clamshell rotate right
19. 12V power supply
3. Boom and chassis attachment select
20. HCU Pedal (Option extra)
4. Right control lever
21. Power max button
5. cigarette lighter
22. Spare
6. Starter switch
23. Hydraulic Adjust Boom pedal (Option extra)
7. Fuel control dial
24. Indicator stalk (horn, windscreen wash/wipe, direc-
tion indicators, roadlight dip/main beam/flash)
8. Park brake switch
25. Steering wheel
9. Swing lock
26. Turn indicator warning lights
10. Quick coupler
27. Park light override
11. Pump override
28. Driving light
12. Swing override
29. Brake pedal
13.Travel override
30.Travel pedal
14. Override F/N/R
31. Clamshell rotate left
15. Air conditioner location
32. F/N/R switch
16. Safety lock lever
33. Mechanical swing lock
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...