MAINTENANCE
SERVICE PROCEDURE
285
2.
Loosen nut (5) attached to fixed bracket (3), and then tighten
bolt (6).
❍
Tighten bolt (6) so that the deflection of the belt will be
5 ~ 8 mm (approx. 58.8N (6kgf)
3.
Tighten bolts (1) and (2) to secure bracket (4).
4.
Loosen bolt (6) to remove from bracket (4).
5.
Tighten nut.
6.
Check for damage to the pulleys, and wear of the V-groove
and V-belt. Be particularly careful to check that the V-belt is
not in contact with the bottom of the V-groove.
7.
If the belt has elongated and there is no more allowance for
adjustment, or if the belt is cut or cracked, replace the belt.
8.
After replacing the V-belt, operate for one hour, then adjust
again.
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...