OPERATION
EXPLANATION OF COMPONENTS
77
BASIC OPERATION OF MACHINE MONITOR
If there is abnormality when starting engine
●
If there is any abnormality when starting the engine, the
check before starting screen changes to the maintenance
interval warning screen, warning screen, or error screen.
●
After displaying the check before starting screen for 2 sec-
onds, the screen changes to the maintenance interval warn-
ing screen.
●
After displaying the maintenance interval warning screen for
30 seconds, the screen returns to the normal screen.
●
After displaying the check before starting screen for 2 sec-
onds, the screen changes to the warning screen or error
screen.
Check before starting screen
Maintenance interval
warning screen
Normal operation screen
Warning screen
Error screen
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...