SERVICE PROCEDURE
MAINTENANCE
278
24. Hub pivot (4 points)
25. Steer links (4 points)
26. Axle pads (If noise heard grease as necessary) (2 points)
27. Cylinder mount (2 points)
28. Top link blade pivot pin (2 points)
29. Lower link blade pivot (2 points)
30. Dozer blade cylinder rod end (2 points)
31. Lower link pivot pin (2 points)
32. Top link pivot pin (2 points)
33. Cylinder guard pin (remove and apply coating of grease)
24
24
25
25
26
32
31
27
28
30 29
27
28
32
31
30
29
33
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...