CHECK AFTER STOPPING ENGINE
OPERATION
194
●
Release 8 of the wheel retaining nuts leaving 2 diagonally
opposed nuts to hold the assembly in position. Check that
there is no remaining pressure being exerted on these rema-
ing nuts by either the internal or external wheel assembly.
Once satisfied that the remaining nuts are under no pressure,
remove them.
●
In order to remove the tyre from the rim first remove the lock-
ring by progressively levering it from the gutter (groove). Do
not exert excessive force as this may deform the retaining
ring.
●
Remove the loose flange and then the tyre/tube.
Re - assembly & inflation
●
Check thoroughly the condition of the wheel and rim for signs
of wear or damage.
Discard any defective or doubtful parts and replace with
approved replacement parts.
Clean the rims with a hard brush paying particular attention to
the bottom of the rim gutter (groove).
●
Fit the tyre to the rim base and fit the tube, ensuring that the
valve is correctly located in its through hole.
●
Place the loose flange against the tyre bead in the orientation
shown in Fig. 1. Push it into place sufficient to clear the rim
gutter (groove) to enable the lock-ring to be fitted.
●
Insert the lock-ring with the aid of specific tools or with levers
and a suitable mallet. Check correct seating of the lock-ring
by measuring the dimension of the gap shown in Fig 2.
If it is not possible to achieve the stated gap with the lock-ring
seated correctly renew the rim assembly.
12
+8
-6
Fig. 2
Содержание PW160-7K Series
Страница 2: ......
Страница 3: ...3 FOREWORD ...
Страница 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Страница 20: ...20 ...
Страница 205: ...OPERATION TRANSPORTATION 205 Before moving off lock all machine cover and toolbox doors to prevent accidental opening ...
Страница 222: ...TROUBLESHOOTING OPERATION 222 ...
Страница 223: ...223 MAINTENANCE WARNING Please read and make sure that you understand the safety volume before reading this section ...
Страница 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Страница 305: ...305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Страница 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Страница 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Страница 357: ......
Страница 358: ...PW160 7K WHEELED EXCAVATOR Form No UEAM003203 2005 KOMATSU All Rights Reserved Printed in Belgium 10 05 ...