53
·
Measurement data can be recorded in the JOB which has been selected. For the JOB selection method, see
“20.1JOB selection”.
·
Check the following once more before measuring.
1. The KTS-442UT is set up correctly over the surveying point.
2. The battery is fully charged.
3. The horizontal circle and vertical circle indexing have been completed.
4. The parameters are set in conformity with measurement conditions.
5. The atmospheric correction factor and prism constant correction, distance measurement methods are set.
6. The center of the target is correctly sighted and the light intensity of the returned signal is sufficiently high.
7. The coordinate measurement preparations in 10.1 and 10.2 are completed.
PROCEDURE
Operating Procedure
Operation
Display
(1) Sight at the target center point, select “1.
Observation” from the coordinate measurement
menu screen, then press ENT (or press numeric
key 1 directly).
Select “1.
OBS” +
ENT
Coord.
Coord PC = 0
PPM = 0
Fine “ r”
STOP