7
.
EtherNet/IP Connection Procedure
26
12
The Synchronization Dialog Box
is displayed.
Check that the data to transfer
(NJ501 shown on the right) is
selected.
Click
Transfer To Controller
.
*After executing "Transfer To
Controller", the Sysmac Studio
data is transferred to
Controller, and the data is
synchronized.
13
The dialog box on the right is
displayed. Confirm that there is
no problem, and click
Yes
.
A screen is displayed stating
"Synchronizing".
The dialog box on the right is
displayed. Confirm that there is
no problem, and click
No
.
*Do not return to RUN mode.
14
Check that the synchronized
data is displayed with the color
specified by "Synchronized" and
that a message is displayed
stating "The synchronization
process successfully finished".
Confirm that there is no
problem, and click
Close
.
*When the Sysmac Studio
project data coincides with the
Controller data, a message is
displayed stating "The
synchronization process
successfully finished".
*If the synchronization fails,
check the wiring and repeat
from step 1.
Содержание F Series
Страница 49: ...46 ...
Страница 50: ...2018 0118 0118 P691 E1 01 ...