
30
Calibration Chamber
SensoGate WA 133
Installing the Calibration Chamber
LF
N
1. Align the guiding edges
(AI)
of the calibration chamber
(K)
and insert it in the process
adaptation
(P)
.
2. Always secure the calibration
chamber with both screws
(AK)
.
AI
P
K
AI
AK
AK
3. Install the loose flange
(LF)
if required. Screw in the inlet
and outlet
(AM)
connectors.
4. Insert the flange bushing
(N)
in the process adaptation
(P)
in direction of the arrow.
5. When you push the flange
bushing
(N)
in the process
adaptation
(P)
, you can feel
how the sealing strip snaps in.
P
AM
Содержание SensoGate WA 133 Series
Страница 43: ...43 Annotations SensoGate WA 133 ...