Suspension Arm Systems Independant
Revision 1
77
7.6.5
Feeding the Supply Cables Through the Extension Arm, Dual Arm
•
Observe the safety notes, see section 7.6.1 “Safety Notes”, page 71.
Fig. 7-25:
Feeding the supply cables through the extension arm, Dual arm
The supply cables (power cables and gas tubes) are pre-installed on the M6 service head.
Dedicated cables, e.g. for nurse call or telephone, are to be fed through the suspension arm
system separately.
•
Carefully lay the supply cables and supply tubes through the extension arm and the
interface plate.
•
Readjust the M6 service head without pulling on the supply cables and supply tubes .
Ensure that cables that have already been laid are not damaged or torn off.
•
Lead dedicated cables, e.g. for nurse call or telephony, through the suspension arm
system.
•
Mount the M6 service head to the suspension arm system according to the Mounting
Instructions of the M6 service head.