Suspension Arm Systems Independant
72
Revision 1
7.6.2
Connecting the Cables on the Extension Arm, Dual Arm
•
Observe the safety notes, see section 7.6.1 “Safety Notes”, page 71.
Fig. 7-22:
Connecting the cables on the extension arm, Dual arm
No.
From
To
Designation
Length
[mm]
Note
Bearing unit
Distribution
board
-
100
integrated into the bearing
unit
Front plate
M6 service head Console tube
Cbl. interf.
Distr. con.
/Distr. cons.
socket
-
integrated in
M6 service head
Distribution
board
M6 service head
Cbl. PCB/M6 SH 2,600
-
Bearing
position 1
Distribution
board
Cbl. brake 1/
PCB, Dual arm
1,100
1,500
Extension arm length 1 =
600/800
Extension arm length 1 =
1,000/1,200
Bearing unit
Cable ,
distribution board
-
100
integrated into the bearing
unit
Mains
connection
Distribution
board
Cbl. mains
connection/PCB 5,000
-
The cables are pre-installed in the factory. The following instructions apply to the connection or
replacement of cables.