![KLS Martin IDP 101 S air plus Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/kls-martin/idp-101-s-air-plus/idp-101-s-air-plus_mounting-instructions_1978996012.webp)
Suspension Arm Systems Independant
12
Revision 1
Scope of delivery
The scope of delivery may vary depending on the order.
Canopy (Single/Duo) (flat/high) (depending on version)
−
1 Single canopy Ø 600 mm x 150 mm, 1 canopy cap 110 mm height
−
1 Single canopy 700 mm x 700 mm x 150 mm height
−
1 Duo canopy (installation with intermediate ceiling) 700 mm x 700 mm x 50 mm
−
1 Duo canopy (installation with intermediate ceiling) 700 mm x 700 mm x 150 mm
−
1 canopy cap 700 mm x 700 mm x 120 mm height
Canopy fastening elements
−
4/6 threaded bolts M10 x 360 mm, 4/6 hexagonal nuts M10,
4/6 self-tapping screws, 4/6 cladding screws and 1 profile strip
For assembly, see section 7.9 “Mounting the Canopy, Cover Caps and Claddings”, page 75.
Extension arm with spring arm and ceiling tube (pre-assembled)
−
1 extension arm in the lengths 600, 800, 1,000 and 1,200 mm
Pre-installed components
−
3 pneumatic pipes for pneumatic brake control
−
3 earthing cables 4 mm² (2 earthing cables if ceiling tube is not installed)
Included components
−
2 setscrews M16 DIN EN ISO 4028, 2 ball stops Ø 12.7 mm
−
2 profile end caps for extension arm
−
2 side panels, front right/left joint, for spring arm
−
1 cover panel, front joint, for spring arm
−
2 cover flaps, front joint, for spring arm
−
2 side panels, rear right/left joint, for spring arm
−
1 cover panel, rear joint, for spring arm
−
2 cover flaps, rear joint, for spring arm
Extension arm fastening elements
−
12 hexagonal nuts M16 and 6 spring washers, 12 washers, external Ø 34 mm and
12 plastic insulating washers, 6 threaded bolts M16 x 330 mm
For assembly, see section 7.3 “Mounting the Ceiling Tube on the Threaded Bolts of the
Interface Plate”, page 48.