![Kirby Morgan SuperLite 17B Скачать руководство пользователя страница 157](http://html.mh-extra.com/html/kirby-morgan/superlite-17b/superlite-17b_operation-and-maintenance-manual_1971910157.webp)
SuperLite
®
17B
© ⅯⅯⅩⅡ Kirby Morgan Dive Systems, Inc. All rights reserved. Document # 120613005
143
clamp that MUST be made as the neck dam ages or
you change to a dry suit mount or a new neck dam.
You should not have to force the clamp shut.
Helmets being used with dry suits made to be sealed
and held in place by the clamp should not hamper
proper adjustment of the clamp. Always check the
clamp adjustment after the first dive. After the first
dive with a new neck dam the neoprene will compress
from the water pressure and will usually require the
clamp to be adjusted in slightly. The tension should
be checked prior to each dive.
1) To adjust the neck clamp, start by loosening the
lock nut and adjusting the position of the nut as
necessary.
2) The outer lock nut has a nylon insert. This lock nut
should be replaced when it no longer offers resistance
on the neck clamp stud. The nut should have a run-
ning torque of at least 6 inch pounds.
3) When the neck clamp assembly is correctly ad-
justed, the clamp should fit tight at the middle of its
travel when mated to the helmet shell. Once the lever
is past midline, movement of the lever should be easy.
From the closed position, the diver should be able
to pull the lever open about one to two inches and
when released, the lever should snap closed. Proper
adjustment of the neck clamp places the bail of the
neck clamp squarely in the groove of the latch catch
body when the clamp is closed.
4) If the neck clamp binds and does not close correctly
after adjustment, the neck clamp must be straight-
ened, or an authorized KMDSI Service Center must
accomplish this procedure.
8.10.4 Neck Dam
8.10.4.1 Neck Dam Replacement
Available Neck Dams Pre-84
Part Number Description
510-649
Neck Dam Pre-84 Small
510-528
Neck Dam Pre-84 Medium
510-650
Neck Dam Pre-84 Large
510-651
Neck Dam Pre-84 X-Large
Draw String Type
Part Number Description
510-533
Neck Dam, Drawstring
510-643
Neck Dam, Drawstring X-Large
Cold Water
Part Number Description
510-652
Neck Dam, Cold Water, Small
510-531
Neck Dam, Cold Water, Medium
510-530
Neck Dam, Cold Water, Large
510-653
Neck Dam, Cold Water, X-Large
General:
The neck dam clamp and yoke assembly are bolted together
and are used as a single unit. KMDSI offers three distinctly
different style neck dams (previously listed) which are
mission specific, but the style is often dictated by personal
preference due to size constraints. It should be noted that
use of the Pre-1984 and Cold Water Neck Dams, which are
preferred by some divers, have some maintenance issues.
Due to the required monthly visual inspection of the weld
points and the clamp assembly, these neck dams will require
You must separate the yoke from the neck clamp to
replace the neck dam.
This hole is where the neck clamp is fed through the
neck dam.