Keysight PD1000A Power Device Measurement System Startup Guide
31
IV and CV Test Requirements
IV and CV Device Characterization
your way up. The cables labeled
2S
(SMU2 Sense) and
2F
(SMU2 Force)
connect to the Medium Current SMU2 installed in Slot 3;
3S
and
3F
connect to SMU3 in slot 4, etc.
3
After completing the cable connections described above, verify the operation
of the B1506A Test Chamber. Refer to the
B1506A User Guide
, Section 2.
4
Install the InTEST Hot Plate in the B1506A Test Chamber and connect the
Thermal Platform Controller. See
Thermal Platform
below.
B1505A Setup
1
Unlike the B1505A, the B1505A doesn’t have a fixed configuration. To use the
B1505A with the SAKE system requires at least following hardware options
and setup:
–
For H21 (20 A) configuration:
-- MCSMU, MPSMU or HPSMU for gate
-- HVSMU for high-voltage measurement on drain/collector
Figure 6
B1506A Rear View: Connect B1506A Test Chamber to the Mainframe
Digital IO Cable
System Cable
N1300A
CMU Cable
InTEST Thermal Hot
Plate pass through
connector. Connect
to Thermal Platform
Controller
Содержание PD1000A
Страница 1: ...Keysight PD1000A Power Device Measurement System for Advanced Modeling Startup Guide ...
Страница 2: ......
Страница 4: ......
Страница 8: ...viii Keysight PD1000 Power Device Measurement System Startup Guide ...
Страница 96: ...94 Keysight PD1000A Power Device Measurement System Startup Guide PD1000A System Specifications ...
Страница 104: ...102 Keysight PD1000A Power Device Measurement System Startup Guide Glossary IGBT Terms ...
Страница 107: ......