32
Keysight PD1000A Power Device Measurement System Startup Guide
IV and CV Device Characterization
IV and CV Test Requirements
-- HCSMU for high-current measurement on drain/collector
-- MPSMU for low-current measurement on drain/collector
-- MFCMU for capacitance measurement
-- N1259A test fixture with module selector option
-- N1272A device capacitance selector
-- N1273A capacitance test fixture
-- Cables and adapters for the connection
–
For H51 (500 A) or H71 (1500 A) configuration:
-- MCSMU or HCSMU for gate
-- HVSMU for high-voltage measurement on drain/collector
-- N1265A Ultra High Current Expander/Fixture
-- MCSMU or HCSMU for Icon (I control) of N1265A
-- MCSMU or HCSMU for Vcon (V control) of N1265A
-- MPSMU for low-current measurement on drain/collector
-- MFCMU for capacitance measurement
-- N1272A device capacitance selector
-- N1273A capacitance test fixture
-- Cables and adapters for the connection
2
Connect the analyzer to its test chamber and make cable connections as
described in the B1505A documentation:
–
B1505A Configuration and Connection Guide
,
https://literature.cdn.keysight.com/litweb/pdf/B1505-90000.pdf
3
After completing the cable connections described above, verify the operation
of the test chamber. For instructions, see:
–
B1505A User Guide, Section 3. See:
https://literature.cdn.keysight.com/litweb/pdf/B1505-90000.pdf?id=1355
658
4
Install the InTEST hot plate in the test chamber and connect the thermal
platform controller. See
Thermal Platform
below.
Thermal Platform
The B1506A or B1505A test chamber can be equipped with a Thermal Platform
(Hot Plate) from InTEST (model HP289-PM) for controlling DUT temperature. The
Thermal Platform is not available from Keysight. The platform consists of a
temperature controller and a hot plate that is installed inside the B1506A Test
Chamber. The controller connects to the Hot Plate inside the B1506A Test
Содержание PD1000A
Страница 1: ...Keysight PD1000A Power Device Measurement System for Advanced Modeling Startup Guide ...
Страница 2: ......
Страница 4: ......
Страница 8: ...viii Keysight PD1000 Power Device Measurement System Startup Guide ...
Страница 96: ...94 Keysight PD1000A Power Device Measurement System Startup Guide PD1000A System Specifications ...
Страница 104: ...102 Keysight PD1000A Power Device Measurement System Startup Guide Glossary IGBT Terms ...
Страница 107: ......