
Operators Manual
Section 4-1
SECTION IV - Operating Instructions
A. Filling the Conditioner Tank
Completely fill the conditioner tank prior to operating
on the first lane. To fill the conditioner tank, the
machine should be in the down position on a level surface.
Pull out both gray tank plugs located on the top of the
tank. (Push down on the collet before pulling on the plug.)
Insert the white funnel assembly provided with the
machine. Located on the right side end of the tank is a
clear sight tube.
Fill the tank until the oil level in the tank reaches
the bottom edge of the right angle gray fitting on the top
side of the machine. Failure to watch the sight glass could
cause the tank to overflow.
This overflow can drain down onto the buffer brush
which will cause an excess amount of conditioner to be
applied to the lane in that area for several lanes.
You should place an oil rag over the buffer directly
below the oil fill vent hole to prevent this. When finished
be sure to remember to replace both gray tank plugs.
Failure to do so could cause a major mess when the machine
is lifted to the transport position.