MAINTENANCE
7-60
Refueling
1. Park the machine following the same procedures as
described on page 7-7 for preparation of inspection/
maintenance work.
IMPORTANT: The turbocharger may be damaged if the
engine is not properly shut down.
WARNING: Handle fuel carefully. Shut the engine off
before fueling. Do not smoke while you fill the fuel
tank or work on fuel system.
2. Check fuel gauge (1) on the monitor panel. Add fuel if
necessary.
IMPORTANT: Keep all dirt, dust, water and other foreign
materials out of the fuel system.
3. To avoid condensation, fill the tank at the end of
each day’s operation. Take care not to spill fuel on the
machine or ground.
Fuel tank capacity: 235 liters (62 gallons)
4. Install and lock fill cap (2) immediately after fueling.
1
2
MNEC-01-002
MNDB-01-026
Содержание 70Z7
Страница 2: ...93108 00691 April 2015...
Страница 5: ......
Страница 11: ...MACHINE NUMBERS 2 MEMO...
Страница 51: ...SAFETY LABELS S 40 6 10 4 1 3 9 6 5 SS 3461...
Страница 171: ...OPERATOR S STATION 1 110 MEMO...
Страница 173: ...BREAK IN 2 2 MEMO...
Страница 187: ...OPERATING THE ENGINE 3 14 MEMO...
Страница 231: ...OPERATING THE MACHINE 5 24 MEMO...
Страница 359: ...MAINTENANCE 7 118 MEMO...
Страница 363: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO...
Страница 367: ...STORAGE 10 4 MEMO...