75
Venkon EC 115 V
75
Maintenance
Other Maintenance Work
Wall-mounted unit,
4-way valve kit
8.3.4 Other Maintenance Work
-
Check the water-side connections, valves and fittings.
- Vent heat exchanger .
- Check the electrical wiring .
- Clean the outlet grille and remove dirt from the airflow.
- Check the antifreeze, if used .
Cleaning the condensate pump
Fig. 68: Condensate pump with
float switch
Ventilkit 1-10
Ventilkit 41-48
Ventilkit 1-10
Ventilkit 41-48
Ceiling model
Wall-mounted unit,
2-way valve kit
The condensate pump with float switch is located on the water
connection side of the basic unit on all models . Its location
depends on the valve kit used on the wall-mounted version .
1. Open the cover of the float switch, clean the float switch
and close the cover again .
Fig. 69: Opening the cover
IMPORTANT NOTE!
Check that the condensate pump and float switch is
working properly after cleaning!
Содержание Venkon EC
Страница 2: ...Venkon EC 115V 2 2 ...
Страница 81: ...81 Venkon EC 115 V 81 ...
Страница 82: ...Venkon EC 115V 82 82 ...
Страница 83: ...83 Venkon EC 115 V 83 ...