Operation
Operation and Commissioning
•
Check filter:
- Check the filter to ensure that it is clean prior to initial start-up
and replace if dirty .
•
Water-side check:
- Are all the air passages on the ducts and adapters the correct
size?
- Has an adequate thickness of impermeable insulation been
fitted?
- Have shut-off valves been fitted if the unit is to be operated
with idle times and the penetration of cold air prevented/
minimised?
IMPORTANT NOTE!
Check the unit for any dirt (packaging waste,
dirt from site etc .) and remove it, if necessary .
Then vent the heat exchanger .