Operation
Condensate drainage
Function of main condensate tray
If the basic unit is used to cool room air, condensate can be produced
during operation . The condensate is collected by the tray under
the heat exchanger and can be drained through one of the two
condensate drain connectors .
Fit valve condensate try (accessory)
The valve condensate tray is already factory-fitted when ordered.
Should it be necessary to retrofit it, for example when servicing, use
the two metal screws to fit the tray to the valve side of the basic unit
(see. Fig. 39)
.
Refer to chapter 6.12 when using a side condensate tray.
6.11 Condensate Drain
Depending on the model of valve kit, the
condensate pump is fixed above or below the main
condensate tray with wall-mounted units.
IMPORTANT NOTE!
When using a side condensate tray, provide for a
condensate drain on site
On-site condensate drainage
It is essential that a condensate drain is fitted to a condensate drain
connector of the fan col unit (outlet size 15 mm) and appropriately
fixed. (Refer to Chapter 6.4 on page 42f Installing Basic Unit With
Gradient) Ensure that the gradient is at least 1 cm/m (in accordance
with DIN EN 12056: formerly DIN 1986-100), without restrictions and
without any rising sections) to ensure that the condensate drains
from the basic unit . Take into account all applicable regulations, such
as the use of a ball trap, when connecting the condensate line to the
sewer system . Protect the trap from drying out, as the suction effect
of the fan on the condensate drain connector could otherwise cause
odours .
Consider the use of water vapour-impermeable insulation depending
on the pipe material used for the condensate drain .
You will need a condensate pump (optional accessories) should a
natural gradient be impossible on site . This is used to pump the
condensate into higher collection or discharge equipment .
When delivered, the condensate pump and float switch is
factory-fitted to the unit.
Fig. 39: Use 2 screws to fit valve
condensate tray
Fig. 40: Valve condensate tray
with ceiling model
Fig. 38: Correct drainage of
condensate
Condensate drain connection
Trap
1 cm/m
INCORRECT
Содержание Venkon EC
Страница 2: ...Venkon EC 115V 2 2 ...
Страница 81: ...81 Venkon EC 115 V 81 ...
Страница 82: ...Venkon EC 115V 82 82 ...
Страница 83: ...83 Venkon EC 115 V 83 ...