Venkon EC 115 V
70
70
Maintenance
Maintenance > Visual Inspections
8.3.2 Visual Inspections
The following components have to be visually inspected:
- Water connections
- Electrical connections
The components to be inspected are located under the left and
right side panels .
The side panels for the respective casing have to be removed to
perform visual inspections .
Perform the following on both side panels:
1.
Open the control opening on the side panel
2.
Use a screwdriver to loosen tapping screw .
3.
Carefully lift side panel by approx . 2 cm .
4.
Move side panel away from the unit towards the room .
5.
If a control (optional accessory) is integrated in the
casing, manually disconnect the cable links from the
reverse polarity protected plug .
1 .
2 .
Fig. 55: Loosen tapping crew in the
side panel
Fig. 56: Remove side panel
Fig. 57: Separate cable connectors