Venkon EC 115 V
60
60
Operation
Operation and Commissioning
7 Operation and Commissioning
Check before initial commissioning whether all necessary
conditions have been met so that the unit can function safely
and properly .
•
Structural tests:
-
Is the fan coil mechanically secure and fixed securely in place?
- Are any casings secured mechanically?
- Are all fan coil components properly installed? Operating the
unit without a main condensate tray or front panel fan unit is
not permitted and can result in serious personal injury!
•
Electrical tests:
- Is all cabling laid in accordance with the applicable regulations?
- Are all wires connected in accordance with the wiring
diagrams?
- Is the earth wire connected and wired throughout?
•
Water-side test:
- Is the flow and return pipework properly connected?
- Are the valves correctly fitted? (Note the permitted installation
position of the actuators!)
- Are all valves and actuators working correctly?
- Are the shut-off valves on-site open?
• Condensate drain (only with units with a cooling function)
- Is the unit installed with a 1 .5% gradient towards the
condensate discharge side .
- Clean the condensate trays before initial commissioning and
remove dirt and site dust .
- Check condensate drain with water
IMPORTANT NOTE!
Refer to the separate instructions for operation
using the Kampmann room controller .
7.1 Pre-Commissioning Checks
Kampmann GmbH can also perform a functional
check (optional). For contact details please refer to
chapter 1.4 „Customer Service“ on page 8.