Venkon EC 115 V
64
64
Operation
Maintenance Schedule:
8.2 Maintenance Schedule:
The sections below describe maintenance work needed for the
proper and trouble-free operation of the equipment:
If there are signs of increased wear during regular checks,
adjust the required maintenance intervals to the actual wear
and teat . Contact the manufacturer with any questions about
maintenance work and intervals
(
Chapter 1.4 „Customer
Service“ on page 8)
.
Interval
Maintenance task
Personnel
as required
Display on room control unit - first read the separate instructions Caretakers/users
for the room control unit
Regular visual inspection of the fixing and
Caretakers/users
examination of damage
quarterly
Visually inspect the filter and replace if necessary
Caretakers/users
(
Chapter 8.3.1. „Changing the Filter“ on page 67)
every six
Clean the inside of the unit
Caretakers/users
months
(
Chapter 8.3.3 „Cleaning Work on the Basic Unit“ on page 72)
every six
Water-side connections, valves, threaded connections
Caretakers/users
months
(
Chapter 8.3.2 „Cleaning the Condensate Pump“ on page 75)
every six
Vent the heat exchanger
Caretakers/users
months
(
Chapter 8.3.4 „Cleaning the Condensate Pump“ on page 75)
every six
Check the electrical connections
Caretakers/users
months
(
Chapter 8.3.4 „Visual Inspections“ on page 70)
every six
Clean the outlet grille, remove deposits from the airflow
Caretakers/users
months
(
Chapter 8.3.4 „Other Maintenance Work“ on page 75)
every six
Check antifreeze (if necessary)
Caretakers/users
months
(
Chapter 8.3.4 „Other Maintenance Work“ on page 75)
every six
Maintain the condensate pump
Caretakers/users
months
(
Chapter 8.3.3 „Cleaning the Condensate Pump“ on page 75)
Содержание Venkon EC
Страница 2: ...Venkon EC 115V 2 2 ...
Страница 81: ...81 Venkon EC 115 V 81 ...
Страница 82: ...Venkon EC 115V 82 82 ...
Страница 83: ...83 Venkon EC 115 V 83 ...