Figure 74: Routing and Control Board Installation
g100223
MX10008
8. To verify that the RCB is functioning normally, check the PWR LED on its faceplate and the CONTROL
BOARDS LED on the status panel. Both LEDs should light steadily shortly after the RCB is installed. If
the PWR LED is blinking yellow, there might be insufficient power available. Ensure that you have
adequate power for the additional unit.
You can also use the the show chassis environment cb command to verify that the RCB is online.
SEE ALSO
Power Requirements for MX10008 Components
MX10008 Routing and Control Board LEDs | 80
Handling and Storing MX10008 Line Cards, RCBs, and SFBs | 244
Removing and Installing MX10008 Cooling System
Components
IN THIS SECTION
Removing an MX10008 Fan Tray | 179
Installing an MX10008 Fan Tray | 183
178
Содержание MX10008
Страница 1: ...MX10008 Universal Routing Platform Hardware Guide Published 2019 11 11 ...
Страница 19: ......
Страница 89: ......
Страница 129: ......
Страница 170: ......
Страница 179: ...Figure 76 Removing Fan Tray JNP10008 FAN from an MX10008 FAN FTC SIB STATUS FAN FTC SIB STATUS 181 ...
Страница 183: ...Figure 79 Installing Fan Tray JNP10008 FAN in an MX10008 FAN FTC SIB STATUS FAN FTC SIB STATUS 185 ...
Страница 278: ...5 CHAPTER Troubleshooting Hardware Restoring Junos OS 283 Alarm Messages 287 ...
Страница 279: ......
Страница 287: ......
Страница 318: ...Restricted Access Warning 321 ...
Страница 333: ...Jewelry Removal Warning 336 ...
Страница 336: ...Operating Temperature Warning 339 ...
Страница 345: ...DC Power Disconnection Warning 348 ...
Страница 349: ...DC Power Wiring Sequence Warning 352 ...
Страница 352: ...DC Power Wiring Terminations Warning 355 ...
Страница 361: ...Translation The emitted sound pressure is below 92 dB A per GR63 CORE 364 ...