![Jung LB management Скачать руководство пользователя страница 96](http://html1.mh-extra.com/html/jung/lb-management/lb-management_manual_2031681096.webp)
5.
Earth conductor and neutral conductor must be present for a 5-core cable.
6.
The connected nodes may be connected to any phases.
7.
The wiring of the DALI nodes can be performed as series or star wiring or as mixed
networking. A terminating resistor is not required.
Control
centre
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
Control
centre
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
Room 1
Room 2
Control
centre
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
8.
The cable length between control unit and the furthest away node must not exceed 300 me-
tres.
max. 300 metres
Control
centre
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
electronic
ballast
96
LB MANAGEMENT LIGHT
Содержание LB management
Страница 1: ...21 LB Management...
Страница 2: ...Company founder Albrecht Jung Ernst Paris 2 COMPANY...
Страница 4: ...4 PREFACE...
Страница 9: ...THE JUNG LB MANAGEMENT 9...
Страница 11: ...THE JUNG LB MANAGEMENT 11...
Страница 15: ...THE JUNG LB MANAGEMENT 15...
Страница 17: ...THE JUNG LB MANAGEMENT 17...
Страница 31: ...Casa Fonte Boa Portugal Photos Jose Campos USAGE SCENARIOS 31 USAGE SCENARIOS 31...
Страница 33: ...01 04 04 04 01 02 03 USAGE SCENARIOS 33...
Страница 43: ...EQUIPMENT OVERVIEW 43...
Страница 51: ...LB MANAGEMENT LIGHT 51...
Страница 111: ...LB MANAGEMENT SHADING 111...
Страница 139: ...TEMPERATURE CONTROL 139...
Страница 155: ...THE CLEVER CONFIG APP 155...
Страница 173: ...OPERATION 173...