6.3.3 Heating optimisation
Heating of the room starts a maximum of four hours before the switching time, so that
the desired temperature in the room is reached when the switching time is reached and
the heating process does not have to be started first. The
OPT
symbol in the display of the
attachment flashes during the heating phase.
Note
: The heating optimisation is designed for space heaters / radiators.
6.3.4 Offset
If it is established that the displayed actual temperature deviates from the general room
temperature, a correction value can be entered in steps of 0.5 °C using this parameter.
The actual temperature is then corrected by this offset value.
6.3.5 Controller adjustment
The control principle should be set depending on the heating system and the insert used.
TWO-POINT CONTROL
With two-point control, the output remains switched on until the specified setpoint tempera-
ture is exceeded by approx. 0.5 °C. The output is not switched on again until the setpoint is
undercut by approx. 0.5 °C. As most heating systems are very sluggish, temperature over-
shoots can occur with this control.
PULSE WIDTH MODULATED CONTROL
The pulse width modulated control is optimised for electrothermal drives, e.g. TVA 230 NC
WW. This means that the output is not continuously activated, but for a certain time (pulse
width), which depends on the temperature difference between the setpoint and actual tem-
perature. With this method, the actual temperature is increasingly approaching the setpoint
temperature. The cycle time is 15 minutes.
6.3.6 Valve adjustment
This parameter is used to adapt to the electrothermal drives used. There are actuators
which are open (normally open, setting
NO
) or closed (normally closed, setting
NC
) when no
supply voltage is present.
TEMPERATURE CONTROL 147
Содержание LB management
Страница 1: ...21 LB Management...
Страница 2: ...Company founder Albrecht Jung Ernst Paris 2 COMPANY...
Страница 4: ...4 PREFACE...
Страница 9: ...THE JUNG LB MANAGEMENT 9...
Страница 11: ...THE JUNG LB MANAGEMENT 11...
Страница 15: ...THE JUNG LB MANAGEMENT 15...
Страница 17: ...THE JUNG LB MANAGEMENT 17...
Страница 31: ...Casa Fonte Boa Portugal Photos Jose Campos USAGE SCENARIOS 31 USAGE SCENARIOS 31...
Страница 33: ...01 04 04 04 01 02 03 USAGE SCENARIOS 33...
Страница 43: ...EQUIPMENT OVERVIEW 43...
Страница 51: ...LB MANAGEMENT LIGHT 51...
Страница 111: ...LB MANAGEMENT SHADING 111...
Страница 139: ...TEMPERATURE CONTROL 139...
Страница 155: ...THE CLEVER CONFIG APP 155...
Страница 173: ...OPERATION 173...