
JOHNSON CONTROLS
38
FORM 450.50-N1
ISSUE DATE: 08/19/2019
SECTION 4 - SC-AP GATEWAY
LD20434
LD20435
FIGURE 44 -
SC-AP CABLE TY-WRAPS
FIGURE 45 -
SC-AP & SC-EQ INSTALLED
DIN RAIL & Velco Panel Mount (Cont'd)
5. Install one ty-wrap mount (p/n 025-25155-000)
above the ribbon cables and one below to retain
the coiled cable using two ty-wraps (p/n 025-
18167-000), as shown in
.
6. Install the coiled SC-AP cable by plugging one
end into the SC-EQ CS RJ Port J1 and the oth-
er end into the SC-AP 6-pin RJ-12 connector.
Caution: Do not plug the SC-AP cable in to the
SC-EQ BAS RJ jack as this exposes the wrong
equipment to the SC-AP.
7. Install the two ty-wraps in the ty-wrap mounts to
hold the coiled cable, loosely tighten the ty-wrap
and trim off the excess ty-wrap ends.
8. The installed SC-AP and SC-EQ should look sim-
FIGURE 43 -
SC-EQ TO SC-AP CABLE
LD21043
Содержание York Smart Equipment SC-EQ
Страница 4: ...JOHNSON CONTROLS 4 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...JOHNSON CONTROLS 8 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 42: ...JOHNSON CONTROLS 42 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...JOHNSON CONTROLS 44 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...