JOHNSON CONTROLS
20
FORM 450.50-N1
ISSUE DATE: 08/19/2019
SECTION 2 - INSTALLATION
YVWE AND YVWH PANEL INSTALLATION
To install the panel on YVWE or YVWH chillers, com-
plete the following steps:
1. Install the SC-EQ on the door inside of the control
2. Connect the appropriate communications cable
from Port J8 (RS-485) on the SC-EQ to XTB3,
which is factory-connected to the control board.
Ensure all wires are correct. See
3. Check for stray wire strands, which could cause
short circuits. Ensure all components are secure.
4. Connect the BAS network to J12 (RS-485) on the
SC-EQ board.
5. Connect the appropriate length of power harness
from J10 on the SC-EQ to XTB3. See
The power harness is included in the kit.
6. Set the required BAS network address for the SC-
EQ using the SW-1 MAC address switches.
When the SC-EQ and the control board are powered
up, the SC-EQ automatically sets itself to the BAS pro-
tocol, baud rate, and chiller model. This may take up
to 120 s.
LD29250
SC-EQ
GROUNDING
SCREW
XTB3
HMI
CONTROL
BOARD
SC-AP
FIGURE 18 -
SC-EQ INSTALLED IN YVWE AND
YVWH
LD29251
FIGURE 19 -
SC-EQ TO YVWE AND YVWH
CONNECTIONS
YEWS AND YGWE SINGLE PANEL
INSTALLATION
To install the panel on YEWS or YGWE chillers, com-
plete the following steps:
1. Install the switch power supply to the DIN35 lead
rail. See
2. Install the SC-EQ on the standoffs of the panel
using M3 screws. See
for YEWS and
for YEWS Tandem, or
for YGWE Tandem.
3. Connect the appropriate communications cable
from Port J8 (RS-485) on the SC-EQ to XTB2
(A4/B4) in the panel. Ensure all wires are correct.
This step is only for YEWS and YGWE Single.
4. Connect the appropriate communications cable
from the XS-09 display (RS485-1, only for the
unit using York-003 board) or IPU3 control board
(TB4:A4/B4, which is factory-connected) to
XTB2 (A4/B4) in the panel. Ensure all wires are
,
, or
5. Check for stray wire strands, which could cause
short circuits. Ensure all components are secure.
6. Connect the BAS network to J12 (RS-485) on the
SC-EQ board.
7. Connect the appropriate length of power harness
from J9 on the SC-EQ to 12 VDC terminals of
switch power supply. See
,
8. Set the required BAS network address for the SC-
EQ using the SW-1 MAC address switches.
When the SC-EQ and the control board are powered
up, the SC-EQ automatically sets itself to the BAS pro-
tocol, baud rate, and chiller model. This may take up
to 120 s.
Содержание York Smart Equipment SC-EQ
Страница 4: ...JOHNSON CONTROLS 4 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...JOHNSON CONTROLS 8 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 42: ...JOHNSON CONTROLS 42 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...JOHNSON CONTROLS 44 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...