Johnson Controls York Smart Equipment SC-EQ Скачать руководство пользователя страница 1

INSTALLATION INSTRUCTIONS

Supersedes: 450.50-N1 (1117)

Form 450.50-N1 (819)

Issue Date: 

August 19, 2019

REV.8

YVWA

YK

035-25087-000 

SC-EQ  

COMMUNICATION CARD

(Also Contains Relevant SC-AP Information)

YMC

2

YZ

Содержание York Smart Equipment SC-EQ

Страница 1: ...INSTALLATION INSTRUCTIONS Supersedes 450 50 N1 1117 Form 450 50 N1 819 Issue Date August 19 2019 REV 8 YVWA YK 035 25087 000 SC EQ COMMUNICATION CARD Also Contains Relevant SC AP Information YMC2 YZ...

Страница 2: ...this document and any referenced materials This in dividual shall also be familiar with and comply with all applicable industry and governmental standards and regulations pertaining to the task in que...

Страница 3: ...sing the John son Controls QuickLIT website at http cgproducts johnsoncontrols com It is the responsibility of rigging lifting and operating service personnel to verify the applicability of these docu...

Страница 4: ...JOHNSON CONTROLS 4 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 5: ...n 17 YVWE and YVWH Panel Installation 20 YEWS and YGWE Single Panel Installation 20 Other Chiller Panel Installation 21 Mounting on a Micro Panel 22 Wall Mounting 23 Applying Power 23 Equipment Config...

Страница 6: ...g on the Equipment 22 FIGURE 25 Wall Mounting 23 FIGURE 26 SC EQ in Enclosure 23 FIGURE 27 SC EQ Component Locations 24 FIGURE 28 Micropanel Rotary Switch 25 FIGURE 29 SC EQ Comm Card to YORKTalk II E...

Страница 7: ...BLE 9 LON ProtoNode Product Code Numbers 46 TABLE 10 Jumper Settings 46 TABLE 11 Switch Settings 46 TABLE 12 Power Connections 47 TABLE 13 Diagnostic LEDs 49 TABLE 14 Technical Specifications 50 FIGUR...

Страница 8: ...JOHNSON CONTROLS 8 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 9: ...Card is installed inside the Micro Panel using the accessory mounting kit The microboard supplies 12 VDC input power eliminating the need for an external power supply For scroll compressor chillers u...

Страница 10: ...pment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of...

Страница 11: ...mmon mode voltage induced problems The SC EQ is supplied as a circuit board that can be installed directly into the equipment s enclosure or can be supplied pre mounted in an enclosure ready for line...

Страница 12: ...he end closest to the VSD If a capacitor is not available the outer shield may be left unconnected or tied directly to ground The best results on the site determine the specific termination strategy e...

Страница 13: ...r other property additional precautions must be designed into the control system Incorporate and maintain other de vices such as supervisory or alarm systems or safety or limit controls intended to wa...

Страница 14: ...E BAS Figure 5 100 OHM RESISTOR INSTALLATION BAS NETWORK WIRING NOTES 1 The shield terminal on the SC EQ is not connected to ground It provides a convenient place to connect shields in two daisy chain...

Страница 15: ...the SC EQ board For BAS systems with 2 wire RS 485 net work cables remember to install the 100 ohm resistor as shown in Figures 4 and 5 5 Connect the appropriate length power harness in cluded with t...

Страница 16: ...ion Wiring Harness 24 VAC Power Transformer Resister Tie Wrap 100 OHM Sheet Metal Screw Expansion Nut Expansion Nut Screw Figure 10 SC EQ SCROLL CHILLER INSTALLATION KIT PART NUMBER 392 41230 001 SMAL...

Страница 17: ...LATION YMAA YCAE AND YCWE E PANEL INSTALLATION To install the panel on YMAA YCAE or YCWE E chillers complete the following steps 1 Install the SC EQ to the bracket using plastic sup port Attach the br...

Страница 18: ...CKET CONTROL BOARD GROUNDING SCREW Figure 13 SC EQ INSTALLED IN YCAE Table 6 BOM OF YCAE SC EQ KIT 371W06163 002 LEVEL ITEM P N DESCRIPTION QTY 1 1 031 03610 000 Gateway SC EQ Board 1 1 10 371W06163 1...

Страница 19: ...JOHNSON CONTROLS 19 SECTION 2 INSTALLATION FORM 450 50 N1 ISSUE DATE 08 19 2019 2 LD29249 Figure 17 SC EQ TO YMAA YCAE AND YCWE CONNECTIONS...

Страница 20: ...EL INSTALLATION To install the panel on YEWS or YGWE chillers com plete the following steps 1 Install the switch power supply to the DIN35 lead rail See Figure 20 Figure 21 or Figure 22 2 Install the...

Страница 21: ...ommunication cables due to the vari ety of types and lengths that may be required Never install the SC EQ Comm Card outside the con fines of a building unless within another enclosure rated IP 65 NEMA...

Страница 22: ...e SC EQ Enclosure on a Micro Panel 1 Disconnect power to the chiller Micro Panel 2 Make sure the SC EQ Enclosure fits properly and that no obstructions such as internal boards switches or external con...

Страница 23: ...Mirco Panel SC EQ Enclosure 241 3mm 9 1 2 in 136 5mm 5 3 8 in Template for Mounting on a wall LD20007 APPLYING POWER When using an enclosure type of SC EQ power can be supplied from either a separate...

Страница 24: ...ications connect the Hot wire to TB BLK and the Neutral wire to TB WHT Con nect the ground wire to the ground lug On 240 VAC applications connect the Hot wire to TB YEL and the Neutral wire to TB WHT...

Страница 25: ...witch YT Address Rotary Switch 1 1 0 2 3 4 5 8 7 9 6 SETTING THE ROTARY SWITCH ON CHILLER PANELS Some Micro Panels use a rotary switch to set their YORK Talk II address YORK Talk address Rotary Switch...

Страница 26: ...ipment Cable York Talk 2 RS485 1200 4800 baud Note If the EPROM used in the board is dated prior to 11 2000 the chiller ID is fixed at 0 If the EPROM used is dated after 11 2000 the chiller ID is soft...

Страница 27: ...r S1 1 0 2 3 4 5 8 7 9 6 031 01095 xxx SLAVE JP19 TB7 RS485 RS232 TB8 BAS BAS BAS GND SHLD 485 485 Rotary Switch Chiller ID 0 Jumper RED SHIELD RED BLACK Equipment Slave Micro Board Cable SC EQ EQ 485...

Страница 28: ...e York Talk 2 RS485 4800 baud SHIELD BLACK RED BLACK RED Open GRD SC EQ EQ 485 Port J8 COM SHLD Equipment Cable York Talk 2 RS485 4800 baud Note Requires ISN EPROMs in locations U4 and U5 The transfer...

Страница 29: ...430 XXX SW1 1 2 3 4 OPEN Program Switches Program Download Connector BOOT UP LED Status Display J4 LD28299 J22 J9 F2 J1 J10 F1 J11 J12 LEDS J21 J6 J5 J13 J18 J2 LED J15 J19 J20 BLACK RED SHIELD Open J...

Страница 30: ...ions will disrupt BAS SC EQ communications See YORK Equipment form 201 21 NMx in the installation Operation Maintenance IOM Air Cooled Screw Liquid Chillers manual for more information Figure 34 SC EQ...

Страница 31: ...r address defaults to 0 which is the Yorktalk equivalent of an ID of 1 Do not change this default ID If you believe this has been modified reset it to 0 Also set the Chiller Local Remote setting to Re...

Страница 32: ...Green Black 0V 10 24V GRD Equipment Cable MODBUS RTU 9600 baud SC EQ EQ 485 Port J8 COM SHLD SC EQ EQ 485 Port J8 COM SHLD A B 12V For node address setting please refer to Chiller Installation Manual...

Страница 33: ...indicates the communi cation activity on the BAS communication port The LED illumination has two variations depending upon the protocol present on the BAS port BACnet MS TP The LED is OFF when there...

Страница 34: ...Q fails to validate the firmware at intial power up or after a firmware up grade Try cycling power to the SC EQ and updating the firmware again Firmware Programming Required The LED is ON solid indica...

Страница 35: ...TER CHECKS The meter checks detailed for the BAS port can also be used for the CS and EQ ports UPDATING THE FIRMWARE AND THE SOFTWARE As new chiller data maps become available it is neces sary to upda...

Страница 36: ...EQ board The software update starts au tomatically and the fault LED flashes quickly dur ing the update process 5 If it does not start automatically cycle power to the SC EQ board by removing and rec...

Страница 37: ...on the DIN rail and push the bot tom mounting bracket clip upwards to secure the SC AP to the DIN rail 5 Install the second Din rail end block p n 025 29189 000 to the front end of the DIN rail as sh...

Страница 38: ...0 as shown in Figure 44 on page 38 6 Install the coiled SC AP cable by plugging one end into the SC EQ CS RJ Port J1 and the oth er end into the SC AP 6 pin RJ 12 connector Caution Do not plug the SC...

Страница 39: ...e List screen as shown in Figure 46 on page 39 The example shows two devices the SC AP and the SC EQ as well as their MAC address The SC AP is always MAC address three In the example below the SC EQ h...

Страница 40: ...So a temporary change of the SC EQ mac node address 2 allows a CS port port mac node change as shown in Figure 48 The virtual MAC address is separate from BMS When it finishes the address can return...

Страница 41: ...e SC APSC EQUIPDATAscreen when theAuto Detected Chiller Protocol is displayed as YorkTalk2 but the Auto Detected Chiller Model is NONE an ad ditional field is displayed named MANUALLY SE LECTED CHILLE...

Страница 42: ...JOHNSON CONTROLS 42 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 43: ...TP and YORK Talk II Protocols with Available EOL Termination Switch EQ 232 Port J7 RS 232 Equipment Port Supporting YORK Talk 3 Protocol Connected Services CS Port J11 RS 485 BAS Port Supporting BACne...

Страница 44: ...JOHNSON CONTROLS 44 FORM 450 50 N1 ISSUE DATE 08 19 2019 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 45: ...er mine what model chiller and what points are available This is based upon the options installed and configu ration of the chiller The ProtoNode then dynamically creates the LON points list One Proto...

Страница 46: ...hazard and is protected against electrical and mechanical dam age To install the ProtoNode into the chiller control panel complete the following steps 1 All switch and jumper settings must remain at t...

Страница 47: ...cables using wire ties and adhesive mounts provid ed in the installation kit Table 12 POWER CONNECTIONS CHILLER MODEL PWR PWR YK OptiView TB6 162 TB6 5 YZ OptiView TB7 162 TB7 5 YMC2 OptiView TB7 162...

Страница 48: ...lly com plete the following steps 1 Power up the chiller panel and the Proto Node 2 Insert a small screwdriver into the Service Pin hole 3 Tilt the screwdriver towards the LonWorks connector to depres...

Страница 49: ...ror screen of the GUI to support for evaluation RX If the socket protocol is serial the RX LED flashes when the host port receives a message If the socket protocol is Ethernet the RX LED is not used T...

Страница 50: ...ved to UL 916 EN 60950 1 EN 50491 3 and CSA C22 2 standards FCC Class A Part 15 DNP3 Conformance Tested RoHS Compliant CSA 205 Approved LonMark Certified Power Requirements 9VDC to 30 VDC or 12 VAC to...

Страница 51: ...with the technician responsible for the BAS network The SC EQ Communication Card has the ability to au tomatically determine the BAS network protocol and communication parameters and set its communic...

Страница 52: ...Pennsylvania USA 17349 1 800 524 1330 Subject to change without notice Printed in USA Copyright by Johnson Controls 2019 www johnsoncontrols com ALL RIGHTS RESERVED Form 450 50 N1 819 Issue Date Augus...