P/N 960-100175R_Rev. 4 {EDP #200824}
© 2013, Japan CashMachine Co., Limited
2 - 1
S e c t i o n 2
This section provides installation/operation
instructions for the Taiko
™
Banknote Acceptor
Series (PUB-7/11). This section contains the
following information:
•
Installation and Removal
•
DIP Switch Configurations
•
Connector Pin Assignments
•
Preventive Maintenance
•
Clearing Banknote Jam
•
Cleaning
•
Interface Schematic
•
Operational Flowchart.
.
Installation and Removal
Installing the PUB-7/11 Taiko Bezel
To install or remove a Taiko
™
PUB-7/11 Unit
Bezel in a door or wall perform the following steps:
1. Create the correct sized opening required to
install the Taiko™ Bezel, using the Panel Cut-Out
Dimensions shown in Figure 2-1.
2. Open the Upper Lid in the arrow direction shown
in Figure 2-2 by pressing in on the Upper Lid
Open/Close Buttons.
3. Hold the Taiko™ Unit by placing your hand
under the Upper Lid (See Figure 2-3
).
4. Slightly press down on the Bezel and raise the
rear Taiko™ Unit body (See Figure 2-3
).
5. Slide the body back and up to detach it from the
Bezel section (See Figure 2-3
).
6. Remove the two (2) Bezel Brackets and the two
(2) Hexagonal Nuts from the Bezel.
7. Insert the Bezel into the previously cut-out
area in the Door Front Panel as shown in
8. Set the Bezel in the door hole and attach the two
(2) Bezel Brackets to the back side of the Bezel
using the two (2) Hexagonal Nuts previously
removed (See Figure 2-5).
2 INSTALLATION
WARNING: Turn the equipment power OFF before removing or replacing any
Taiko™ components!
Figure 2-1
Taiko Bezel Cut-Out Dimensions
Figure 2-2
Opening Taiko’s Upper Lid
Figure 2-3
Removing the Taiko Bezel
Figure 2-4
Installing the Taiko Bezel
WARNING: Tightening the Nuts with too
much force can damage the Bezel. The
necessary torque is 0.513 foot-lbs
(0.7Nm).