
24
UMG 96RM-M
Connection diagram, current measurement
L1
L2
L3
N
I1
I2
I3
• 3p 4w (addr. 510= 0), factory setting
• 3p 2i (addr. 510 = 1)
L1
L2
L3
N
I1
I2
I3
L1
L2
L3
I1
I2
I3
• 3p 2i0 (addr. 510 = 2)
L1
L2
L3
I1
I2
I3
• 3p 3w3 (addr. 510 = 3)
Fig. Measurement in a three-phase net-work
with an unbalanced load.
Fig. The measured values for the I2 current
measurementinput are calculated.
Fig. System with uniform phase loading. The
measured values for the I2 current measurement
input are measured.
Fig. Measurement in a three-phase net-work
with an unbalanced load.
Содержание UMG 96 RM-M
Страница 13: ...13 UMG 96RM M...
Страница 15: ...15 UMG 96RM M...
Страница 33: ...33 UMG 96RM M...
Страница 65: ...65 UMG 96RM M Work values within the software GridVis Control of the values 187E 6270 10 resolution 62700 Wh...
Страница 81: ...81 UMG 96RM M...
Страница 102: ...102 UMG 96RM M Dimensional drawings All dimensions in mm max 6 91 5 104 96 42 Rear view Side view...
Страница 103: ...103 UMG 96RM M Bottom view 97 91 5 Cutout dimensions 92 0 8 92 0 8...
Страница 111: ...111 UMG 96RM M...