
OCEANO HD-55 Pull & Lift – User Guide
System:
HD-55
Preventive Maintenance
Sub-system
: HD-55
Reference:
PM02
Page:
1/4
Subject:
Dismantling the HD-55
Maintenance level: 2
Duration:
10 minutes
Hexagonal Allen key 10, handle
None
None
Part 1 – Removing the sheave
Refer to drawing 2909202
for parts identification.
Step
Action
1.
Remove the split pin GFV5-65-S.
2.
Remove the nut (9102984-2) of the top axis (9102984
-1
) and the washer (9102986).
3.
While holding the sheave (9102979), remove the pin (9102984).
4.
Recover the sheave (9102979).
5.
End of procedure.
Equipment
Precaution
Preliminary
Steps
MU-HD55P&L-AN-001 Ed. G – October 2013
17
Содержание AR861 FSR
Страница 1: ...OCEANO HD 55 PULL LIFT AR861 FSR User Guide...
Страница 2: ......
Страница 8: ......
Страница 39: ...OCEANO HD 55 Pull Lift User Guide MU HD55P L AN 001 Ed G October 2013 31...
Страница 40: ...OCEANO HD 55 Pull Lift User Guide MU HD55P L AN 001 Ed G October 2013 32...