1
2
3
4
Item Description
1.
Jackscrew
2.
Baseplate
3.
Foundation
4.
Plate
Figure 6: Jackscrews
3.
Level the driver mounting pads:
NOTICE:
Remove all dirt from the mounting pads in order to ensure that the correct leveling is achieved.
Failure to do so can result in equipment damage or decreased performance.
a) Put one machinist's level lengthwise on one of the two pads.
b) Put the other machinist's level across the ends of the two pads.
c)
Level the pads by adjusting the four jackscrews in the corners.
Make sure that the machinist's level readings are as close to zero as possible, both lengthwise and
across.
Use the baseplate-leveling worksheet when you take the readings.
1
2
3
4
5
6
Item Description
1.
Machinist's levels
2.
Driver's mounting pads
3.
Foundation bolts
4.
Jackscrews
5.
Grout hole
6.
Pump's mounting pads
Figure 7: Level driver mounting pads
4.2 Baseplate-mounting procedures
Model ICO i-FRAME, ICOH i-FRAME Installation, Operation, and Maintenance Manual
21
Содержание GOULDS PUMPS ICO i-FRAME
Страница 1: ...Installation Operation and Maintenance Manual Model ICO i FRAME ICOH i FRAME ...
Страница 2: ......
Страница 104: ...8 1 Parts list 102 Model ICO i FRAME ICOH i FRAME Installation Operation and Maintenance Manual ...
Страница 105: ...8 1 Parts list Model ICO i FRAME ICOH i FRAME Installation Operation and Maintenance Manual 103 ...