1
7
6
2
3
4
5
Item Description
1.
Baseplate
2.
Shims or wedges
3.
Grout
4.
Foundation
5.
Sleeve
6.
Dam
7.
Bolt
Figure 12: Pour grout into baseplate
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
1
5
4
2
3
Item Description
1.
Baseplate
2.
Grout
3.
Foundation
4.
Dam
5.
Bolt
Figure 13: Fill remainder of baseplate with grout
7.
Remove the leveling jackscrews after the grout hardens in order to remove any stress points.
8.
Tighten the foundation bolts.
9.
Make sure that treatment of the concrete is in accordance with DIN 1045.
4.5 Grout the baseplate
32
Model ICO i-FRAME, ICOH i-FRAME Installation, Operation, and Maintenance Manual
Содержание GOULDS PUMPS ICO i-FRAME
Страница 1: ...Installation Operation and Maintenance Manual Model ICO i FRAME ICOH i FRAME ...
Страница 2: ......
Страница 104: ...8 1 Parts list 102 Model ICO i FRAME ICOH i FRAME Installation Operation and Maintenance Manual ...
Страница 105: ...8 1 Parts list Model ICO i FRAME ICOH i FRAME Installation Operation and Maintenance Manual 103 ...