Frame adapter
•
Provides safe and accurate alignment for the liquid end to the bearing frame.
•
Large access windows make installation and maintenance of seal and auxiliary support systems
trouble-free.
Bearings
Heavy-duty ball bearings provide L10 bearing life in excess of 17,500 hours.
The size of the bearing frame is shown in the data sheet and/or order confirmation.
Bearing frame
Bearing type
Pump side Drive side
24 i-FRAME
6307 - C3 3307A - C3
32 i-FRAME
6309 - C3 3309A - C3
42 i-FRAME
6311 - C3 3311A - C3
48 i-FRAME
6313 - C3 3313A - C3
Shaft
Rigid shaft designed for less than 0.05 mm shaft deflection. Standard 400 series stainless steel shaft
(1.4021) provides reliable power transmission and corrosion resistance at both the pump and coupling
ends.
3.2 General description i-ALERT
®
2 Equipment Condition Monitor
Description
The i-ALERT
®
2 Equipment Condition Monitor is a compact, battery-operated monitoring device that con-
tinuously measures the vibration and temperature of the pump power end. The i-ALERT
®
2 sensor uses
blinking red LEDs and wireless notification to alert the pump operator when the pump exceeds vibration
and temperature limits. This allows the pump operator to make changes to the process or the pump be-
fore a catastrophic failure occurs. The Condition Monitor is also equipped with a single green LED to in-
dicate when it is operational and has sufficient battery life. (i-ALERT
®
2 Bluetooth Equipment Condition
Monitor option available. The i-ALERT
®
2 monitor allows customers to identify potential problems before
they become costly failures. It tracks vibration, temperature and run-time hours and wirelessly syncs the
data with a smart phone or tablet the i-ALERT
®
2 mobile app. More information available on
More information available on
http://www.ittproservices.com/aftermarket-products/monitoring/i-alert2/i-
3.2 General description i-ALERT®2 Equipment Condition Monitor
16
Model ICO i-FRAME, ICOH i-FRAME Installation, Operation, and Maintenance Manual
Содержание GOULDS PUMPS ICO i-FRAME
Страница 1: ...Installation Operation and Maintenance Manual Model ICO i FRAME ICOH i FRAME ...
Страница 2: ......
Страница 104: ...8 1 Parts list 102 Model ICO i FRAME ICOH i FRAME Installation Operation and Maintenance Manual ...
Страница 105: ...8 1 Parts list Model ICO i FRAME ICOH i FRAME Installation Operation and Maintenance Manual 103 ...