
APRIL 2020 • REVISION 4.0
INSTRUCTION MANUAL
23
At this point, make a final check to ensure that all openings are correctly sealed and that smoke
detectors are covered or isolated.
5.1.11
If the main unit indicates correct fluid level in the tank, exit the treatment area through the
remaining unsealed door or temporary barrier.
5.1.12
Close and seal the last door with DVI tape from the outside. Should you miss the low fluid
level indication on the main unit and present your operator card to the process monitor card
reader the system will request a refill by displaying a prompt on the screen with the refill
request. Follow the steps in point 5.1.10 to refill the system.
5.1.13
Follow the on-screen
instructions. Present
your operator card to the
process monitor card
reader. The following
prompts will appear:
‘Location’ - Type in
the process location
using the displayed
keyboard on the
touch screen. Touch
‘YES’ to continue.
5.1
ProXcide™ Operator Instructions
Содержание ProXcide
Страница 8: ...8 www inivos com INSTRUCTION MANUAL REVISION 4 0 APRIL 2020 1 2 ...
Страница 41: ...APRIL 2020 REVISION 4 0 INSTRUCTION MANUAL 41 Issue 4 Pop up box for issue 4 ...
Страница 42: ...42 www inivos com INSTRUCTION MANUAL REVISION 4 0 APRIL 2020 Issue 5 Pop up box for issue 5 ...
Страница 43: ...APRIL 2020 REVISION 4 0 INSTRUCTION MANUAL 43 Issues 12 Pop up box for issue 12 ...
Страница 44: ...44 www inivos com INSTRUCTION MANUAL REVISION 4 0 APRIL 2020 Issue 13 Pop up box for issue 13 ...
Страница 45: ...APRIL 2020 REVISION 4 0 INSTRUCTION MANUAL 45 Issues 16 to 20 Pop up box for issues 16 20 ...