EonStor / EonStor DS S12/S16/S24 Series
101
Installing the FBM (Type I)
1. Remove the BBU module
(1)
(please refer to the previous section).
2. Remove the top screw
(2)
and side screw
(3)
of the top cover
(4)
and remove it from
the controller chassis.
3. Install
the
FBM
(5)
by orienting and inserting it at an approximately 15 degree angle
into the socket. The socket is located on the charger board.
4. Make sure the FBM’s gold fingers are fully inserted. Press the FBM down and make
sure the retention latch
(6)
on the socket holds the FBM in place.
5. Install the RAID controller back into chassis. Insert the controller slowly into the
module slot. When you feel the contact resistance by your hands, use more force, and
then push both of the ejection levers upwards to secure the controller into chassis.
6. Secure the controller by fastening two screws you previously removed to the ejection
levers.
65
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...