Slide Rail Installation Guide
50
Enclosure Installation Prerequisites
To ensure proper installation and functionality of the RAID system, please observe the
following warnings:
all compo ents have been received against the “Unpacking List”. Contact
r immediately if anything is missing
Install the enclosure as-is out of the packaging; install hard drives and optional
modules (FBM and / or BBU) after the enclosure has been mounted
nti-static wristband before nd during the installation procedure
d to plug the system into two different po er sources (eg. into a
et and another into a UPS
Ensure the rack whic the enclosure is mounted onto has proper grounding and
over-current protection
Do not obstruct ventilation openings; provide 20cm of free space at the front and back
of the enclosure for air circulation; keep the ambient temperature below 35 degree
Celsius
Cross check
n
your vendo
Wear an a
a
It is recommende
w
power outl
)
h
193
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...