
EonStor / EonStor DS S12/S16/S24 Series
4. Insert the replacement module. Make
highest position so that the sa
sure the extraction handle
(1)
is held at its
ddle notches on the sides of the handle can snap
e to engage the back-end connectors. Push the handle
downwards to secure the module.
onto the metal anchor pins
(2)
placed along the interior walls of the PSU slot.
Push the PSU into chassis
(3)
, and when you feel the contact resistance, use
slightly more forc
5. Fasten the retention screw.
6. Reconnect the power cord.
7. Power on the PSU module.
155
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...