
IFT-9279CSlider36 Slide Rail Kit
188
1.
Determine rail installation
Installation Procedure
position. The screw-hole locations that secure the slide rail
u
n
M5 flathead screws
(04)
. Between the two M5 flathead screws on the front rack post, leave 4-hole spaces
(indicated by the
blue circle
).
sing M5 flathead screws
(04)
must match on front and rear posts. Place two cage
uts
(06)
on the two outer most holes of the front post between the
06
04
04
Rear rac
Front rack post
Determine rail length, secure rail to posts and place cage buts
2. Attach filler plates
(07)
to the left / right ears of the enclosure using cross recess
flathead screws #6-32
(05)
. The R and J on the filler plates indicate RAID and JBOD,
respectively.
k post
206
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...