EonStor / EonStor DS S12/S16/S24 Series
20
Unpacking the System
Compare the
Unpacking List
included in the shipping package against the actual
package contents to confirm that all required materials have arrived.
90
Box contents
For detail box content(s), please refer to the unpacking list that came with the
system.
The accessory items include a serial port cable, screws,
Quick Installation Guide
, a
CD containing the
SANWatch
management software and its manual and
Firmware
Operation Manual
, and a product utility CD containing the
Installation and
Hardware Reference Manual
(this document).
91
Preinstalled Components
Shown below are the components pre-installed in the system:
LCD/LED front panels
Chassis ears with plastic caps
DIMM module for RAID models
CBM (dual controller systems, please refer to
)
PSUs including cooling modules
92
Components to Be Installed
You must install the following components:
The enclosure itself (please refer to the
Slide Rail Kit Installation Guide
Controller
module(s)
Hard
drives
Drive
trays
Cabling
CBM (single controller systems, please refer to
)
Earth lead cable (DC PSU systems only)
52
Содержание EonStor DS S12S-J2000-G
Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...
Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...
Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...