background image

EonStor / EonStor DS S12/S16/S24 Series   

80

Cache Backup Module (CBM) for RAID Models 

The Cache Backup Module (CBM), located inside the controller, consists of a battery 

backup unit (BBU) 

(1)

 and flash backup module (FBM) 

(2)

. The CBM can sustain 

cache memory after a power failure. The use of a CBM is highly recommended in 

order to safeguard data integrity. If you are using the single controller models and 

would like to install a CBM, refer to 

X

CBM Installation

X

1

2

Type I 

Type II

 

For type II dual controller systems, the Cache Backup Module is a standard feature 

pre-installed into the controller and an optional accessory for single controller models. 

The Battery Backup Unit (BBU) can be serviced by the user but the Flash Backup 

Module (FBM) is not serviceable by the user. 

 

NOTE 

The BBU is only charged partially when shipped. Therefore, after powering on the 

system the BBU will start charging to its full capacity. It normally requires 

approximately twelve hours for the battery to be fully charged. If the battery is not 

fully charged after twelve hours, there may be a problem with the BBU and you 

should contact your system vendor immediately. You can also check the status of the 

battery module via SANWatch or the firmware (please refer to respective manuals). 

41 

Содержание EonStor DS S12S-J2000-G

Страница 1: ...Table of Contents Infortrend Infortrend EonStor EonStor DS S12 S16 S24 Series Hardware Manual Version 2 6...

Страница 2: ...h Infortrend product Before installing any software applications or components provided by a third party customer should ensure that they are compatible and interoperable with Infortrend product by ch...

Страница 3: ...USA Tel 1 408 988 5088 Fax 1 408 988 6288 Email Technical Support Website US East Coast Office 4 Northeastern Blvd Suite 21B Nashua NH 03062 USA Tel 1 603 610 6398 Fax 1 603 610 6383 Email Technical...

Страница 4: ...rthermore Infortrend Technology reserves the right to revise this publication and to make changes from time to time in the content hereof without obligation to notify any person of such revisions or c...

Страница 5: ...20cm clearance on the rear side Do not cover the enclosure openings Route the cables inside the rack cabinet Do not leave drive bays empty as it will affect airflow efficiency Secure each enclosure m...

Страница 6: ...ent When replacing components insert them as gently as possible while assuring full engagement Vibration and shock can easily damage hard drives Only qualified service personnel should open the enclos...

Страница 7: ...discharge static electricity when installing or operating the enclosure Avoid dust debris carpets plastic vinyl and styrofoam in your work area Do not remove any module or component from its anti stat...

Страница 8: ...4 S12F R S2840N S12S J2000R S N models 1 2 Aug 2011 Fibre iSCSI model tables updated 1 3 Oct 2011 Format change for translation compatibility Copyright and Contact info update 1 4 Nov 2011 Preinstalle...

Страница 9: ...2 3 Jan 2013 Added ESDS SxxF 2851 models 2 4 Feb 2013 Updated ESDS S12 16 E GR2251 specifications 2 5 Apr 2013 Added ESDS B24 JBOD support for designated 2U RAID systems Added ESDS SxxF GR2651 and Sxx...

Страница 10: ...e 31 Front Panel Components 32 LCD LED Panel 32 Chassis Ear 34 Drive Tray 35 Rear Panel Components 36 Controller Module of RAID Models 36 Controller Module of JBOD Models 37 Host Port of RAID Models 3...

Страница 11: ...Fabric Connection Single Controller 83 SAS Host RAID Connections 85 SxxS R G2240 4 Controllers in DAS Direct Attached Storage Configuration 86 DAS Direct Attached Storage Connection with Redundant Ho...

Страница 12: ...for RAID Models 149 BBU Fault Conditions and Precautions 150 Replacing the BBU 151 Replacing the FBM 152 Replacing the Power Supply Module Cooling Module 153 Detecting a Failed PSU 153 Replacing the P...

Страница 13: ...ng the System 194 Component Installation Procedure 194 Tools Required 194 IFT 9272CESlide28 0030 IFT 9272CESlide36 0030 195 IFT 9272 Kit Contents 195 Installation Procedure 196 IFT 9273CESlide32 0010...

Страница 14: ...The naming rules for RAID and JBOD models are explained in the example below RAID SxxF Rxxxx S A xx B F C R D xxxx F N JBOD SxxS JxxxxR S A xx B S C J E xxxx F R D N Designation Description A Drive si...

Страница 15: ...t to a master RAID system and can expand storage capacities by adding more hard drives All systems are compatible with SAS 3 and SAS 6 SATA II and SATA III hard drives However hard drive limitation s...

Страница 16: ...8 8Gbps x 6Gbps G R 2840N 4 8 8Gbps x 6Gbps GN RN 2850 4 8 8Gbps x 6Gbps G R 2851 4 8 8Gbps x 6Gbps G R SAS S12S No of host ports G S R Port speed Hybrid 1Gb iSCSI port Hard Drive connectivity Single...

Страница 17: ...2 4 1Gbps x 6Gbps G R 2152 6 4 8 1Gbps 2 4 6Gbps G R 2240 2 4 10Gbps x 6Gbps G R 2251 2 4 10Gbps x 6Gbps G R Fibre S16F No of host ports G R Port speed Hybrid 1Gb iSCSI port Hard Drive connectivity S...

Страница 18: ...bps x 6Gbps G R 2242 2 4 6Gbps 2 6Gbps G R JBOD S16S Exp Port type Port speed Hybrid 1Gb iSCSI port Hard Drive connectivity Single controller Dual controller J1000 8470 3Gbps x 3Gbps S R J1000 8470 3G...

Страница 19: ...controller Dual controller 1440 2 4 4Gbps 3Gbps G R 1840 8 8Gbps 3Gbps x R 2651 2 4 16Gbps 6Gbps G R 2840 4 8 8Gbps 6Gbps G R 2850 4 8 8Gbps 6Gbps G R 2851 4 8 8Gbps 6Gbps G R SAS S24S No of host port...

Страница 20: ...raditional 72 hours limitation The embedded firmware features intelligent algorithms such as power saving modes variable fan speeds and exiled drive handling making this model a greener choice 6 3 JBO...

Страница 21: ...able power supply unit PSU modules provide constant power to the system The modular nature of the system and the easy accessibility to all major components ensure ease of maintenance 4U series The S24...

Страница 22: ...3Y 405W Be sure every PSU should have t he same mark 3Y 405W C H0 C H1 C H0 C H1 The top controller Controller A is the primary controller which manages the entire RAID system in normal operations The...

Страница 23: ...Controller to Dual Controller System If the model name of a single controller RAID JBOD is designated with the letter S it can be upgraded into a dual controller configuration by adding another contro...

Страница 24: ...a rack or cabinet 6 9 Front Panel RAID Models ESC E NT PWR BUSY MUTE A TTEN 1 2 3 LCD keypad panel 1 A 16 characters x 2 rows LCD panel and function keys allows you to view system events and configur...

Страница 25: ...ED panel 2 The LED panel indicates the operating status through five LEDs Mute Service button 3 The mute button is to mute an alarm when sound or to indicate to the administrator the system requires s...

Страница 26: ...2 S16 S24 Series 7 0 Rear Panel Designation Description Designation Description 1 Controller A 4 Cooling Module 2 Controller B 5 Dummy cage 3 Power supply cooling module 2U Gxxxx models 2U R S2840N an...

Страница 27: ...a pre installed DIMM module For single controllers a dummy cage will be placed at the controller 2 position The host port configurations will vary For details see Rear Panel Components WARNING Do NOT...

Страница 28: ...lease refer to S24 RAID Series PSU Cooling modules 3 4 2U 3U The redundant cooling modules ventilate the system and for selected 2U models they may or may not be embedded in the power supplies For det...

Страница 29: ...ling Module 2 Controller B or dummy cage for single controller models 5 Power supply cooling module 3 Power supply 2U J1002R 2U J2000R G 2U J2000R S N 3U J1000S R 3U J1000S R 1 3U J2000R S Dual contro...

Страница 30: ...tatus report and reports component status through the SAS links with a RAID system Dummy cage 2 For single controller systems a dummy cage is placed in the bottom controller position Do not remove the...

Страница 31: ...gic level signals and low voltage power paths Thermal sensors and I2C devices are embedded to detect system temperatures and PSU cooling module operating status This board contains no user serviceable...

Страница 32: ...n a multi array configuration E SC E NT PWR BUSY MUTE A TTEN ESC ENT PWR BUSY MUTE ATTEN 1 2 3 4 Status LEDs 1 From top to bottom the status LEDs are power PWR busy BUSY and attention ATTN LCD screen...

Страница 33: ...power supply status LED 2 cooling module status LED 3 temperature sensor status LED 4 System fault LED 5 rotary ID switch 6 and a Mute Service button 7 For details please refer to LED Panel for JBOD M...

Страница 34: ...anel see the previous sections for details is mounted on the left chassis ear A plastic housing conceals the chassis ear To access the finger grips flip open the panel You may then grasp the finger gr...

Страница 35: ...is a drive busy LED 3 and a power status LED 4 WARNING Be careful not to warp twist or contort the drive tray in any way e g by dropping it or resting heavy objects on it If the drive bay superstructu...

Страница 36: ...s a Cache Backup Module CBM consisting of a Battery Backup Unit BBU and Flash Backup Module FBM The CBM and its components might be optional items See Cache Backup Module CBM for RAID Models for detai...

Страница 37: ...dels 8470 SAS connector type 1 4 4 3 J1002R J2000 JBOD models 8088 SAS connector type 1 1 2 2 3 4 4 5 The expansion controller contains a circuit board within a metal canister interfaced through hot s...

Страница 38: ...R1440 2x 4Gb s Fibre SxxF G Rx8xx 4x 8Gb s Fibre SxxF G R26xx 2x 16Gb s Fibre SxxF G R26xx 4 2x 16Gb s Fibre 2x 1Gb s iSCSI SxxF G R2842 G R2852 6 4x 8Gb s Fibre 2x 1Gb s iSCSI 4Gb s or 16Gb s fibre...

Страница 39: ...AS Host RAID Models SxxS Series Model Host port type per controller SxxS G R2240 2x 6Gb s SAS SxxS G R2240 4 G R2250 4x 6Gb s SAS S16S G R2242 2x 6Gb s SAS 2x 1Gb s iSCSI 6Gb s SAS Host Ports 6Gb s SA...

Страница 40: ...l Host port type per controller S12E G1140 2x 1Gb s iSCSI SxxE G R2240 G R2251 2x 10Gb s iSCSI SxxE G R1140 G R 1149 G R2140 G R2149 4x 1Gb s iSCSI SxxE G R2142 G R2152 6 6x 1Gb s iSCSI 1Gb s iSCSI Ho...

Страница 41: ...dule is a standard feature pre installed into the controller and an optional accessory for single controller models The Battery Backup Unit BBU can be serviced by the user but the Flash Backup Module...

Страница 42: ...U The PSU comes with a power socket 1 extraction handle 2 retention screw 3 PSU status LED 4 power switch 5 cooling fan module status LEDs 6 and cooling module 7 1 1 2 3 4 5 6 7 6 1 1 5 4 3 2 7 6 6 2U...

Страница 43: ...ignation The PSU comes with a power socket 1 a power switch 2 PSU status LED 3 cooling module 4 cooling module status LEDs 5 retention screw 6 and an extraction handle 7 NOTE For DC PSU powered system...

Страница 44: ...o increase the airflow Component failure if a cooling module PSU or a temperature sensor fails Elevated temperature if the temperature breaches the upper threshold set for any of the interior temperat...

Страница 45: ...pped with three 3 redundant and hot swappable load sharing PSUs at the rear section of the chassis The PSU is housed in a 1U canister containing both the power supply and dedicated cooling modules The...

Страница 46: ...rate at two fan speeds When the system is operating normally the cooling fans operate at the lower speed If a system module fails or when one of the temperature thresholds has been exceeded the coolin...

Страница 47: ...and deliver warning messages if there is a conflict between JBOD IDs If more than one JBOD is connected to the managing RAID system each JBOD needs a unique enclosure ID set by the rotary switch on th...

Страница 48: ...connected to the system s serial port SANWatch SANWatch is a Java based graphical user interface GUI software that can be installed on a local remote computer and accessed via the network The manager...

Страница 49: ...ng replaced The following components are hot swappable Controller module dual controller models PSU including cooling modules Cooling modules selected models Hard drive NOTE Normalized airflow ensures...

Страница 50: ...amaged contact your vendor for a replacement Hard drives SAS SATA hard drives must be purchased separately and be available prior to installing the system Cabling All the cables that connect the syste...

Страница 51: ...hard drives Installing the system into a rack or cabinet requires at least two people due to its weight If you need to install the slide rails that came with the system please go here 3 Install CBM if...

Страница 52: ...oduct utility CD containing the Installation and Hardware Reference Manual this document 9 1 Preinstalled Components Shown below are the components pre installed in the system LCD LED front panels Cha...

Страница 53: ...has been rack mounted Please refer to the RAID Enclosure Slide Rail Kit Installation Guide or the quick installation guide that came with the system Users need to observe ESD precaution measures at al...

Страница 54: ...recommended to use large storage capacity hard drives WARNING Even hard drives by the same manufacturer of the same model and claiming the same rated capacity may actually carry different block numbe...

Страница 55: ...e MUX kits MUX Board Shown below controller A 1 and controller B 2 is connected to the backplane 3 With a MUX board 4 paired to the hard drive 5 data signals is able to switch between controllers A an...

Страница 56: ...on Two types of MUX boards are available for 3 5 inch drive trays The two differs in that one is a flat plate that sits underneath the MUX board and the other in the form of a U shaped plate MUX board...

Страница 57: ...o Storage Manager Information Enclosure View The icons indicate the current status of each hard drive tray Icons The drive tray is filled with an available hard drive The drive tray is empty The drive...

Страница 58: ...ld for 30 seconds so the hard drive can spin down Then gently pull out the hard drive tray out of the enclosure and remove the four retention screws to remove the hard drive b If it is an empty tray j...

Страница 59: ...ith MUX board Installing a Hard Drive with a MUX Board SATA drives 7 Insert the drive tray back to the enclosure Install the drive tray with the front bezel open When fully inserted close the front be...

Страница 60: ...rive trays must be separately purchased and applied The single controller JBODs do not require MUX kit Dual ported SAS and Single port SATA Connectors WARNING The hard drives and drive trays should on...

Страница 61: ...s facing the open side of the drive tray and its label side facing up If you have a MUX board and you want to install a SAS drive the MUX board should be removed Installing a Hard Drive without a MUX...

Страница 62: ...WARNING Each drive bay must be populated with a tray even if it does not contain a hard drive With a bay empty ventilation will be disrupted and the system will overheat With the hard drive tray beze...

Страница 63: ...e system while the FBM may be default or an optional item For details please refer to Cache Backup Module CBM for RAID Models For single controller models the CBM BBU FBM will be pre installed for you...

Страница 64: ...below please see type II BBU installation instructions 1 0 0 Installing the BBU Type I Install the BBU 1 by orienting its protruding edge on one end into the insertion slot 2 and lowering it into the...

Страница 65: ...The socket is located on the charger board 4 Make sure the FBM s gold fingers are fully inserted Press the FBM down and make sure the retention latch 6 on the socket holds the FBM in place 5 Install t...

Страница 66: ...t your vendor Remove the four screws and the top cover from the controller shown below Install the BBU to the top cover by securing the three screws Insert the back end of the BBU 1 onto the controlle...

Страница 67: ...force and then push both of the ejection levers upwards indicated by the blue arrows to secure the controller into chassis 2 Secure the controller by fastening the two retention screws under the eject...

Страница 68: ...r DC PSU systems Grounding Kit Contents Item Description Quantity A Grounding cable 1 B Ground screw 6 32 1 4 inch with star shaped washer 2 C M5 cage nut 1 Internal diameter External diameter Interna...

Страница 69: ...the accessory box It is recommended to install the earth lead kit once the enclosure has been installed into the cabinet To install attach one end of the earth lead cable to the enclosure and secure...

Страница 70: ...performance of this logical drive should approximate the channel bandwidth If for example two 6 drive logical arrays are associated with two IDs residing on a single host channel there may be a trade...

Страница 71: ...oute the cables away from places where it can be damaged by other devices e g foot traffic or fan exhaust Do not over tighten or bend the cables 1 0 5 Host Side Topologies The primary concern for conf...

Страница 72: ...and D and four host IDs LUNs IDs 0 1 2 and 3 in a configuration where Host A accesses ID 0 one nexus Host B accesses ID 1 one nexus Host C accesses ID 2 one nexus Host D accesses ID 3 one nexus These...

Страница 73: ...l or you can choose the Auto automatically configured setting The default value is 256 I O operations The appropriate Maximum Queued I O Count setting depends on how many I O operations the attached s...

Страница 74: ...Host Components including 10GB iSCSI WARNING Lasers can be hazardous and may cause permanent eye damage or blindness and therefore must be treated with respect and used with caution Never look direct...

Страница 75: ...ed safety do not remove any covers or attempt to gain access to the inside of the product Refer all servicing to qualified personnel FC port dust plugs Each FC port comes with a dust plug Remove these...

Страница 76: ...is the most common topology currently in use Fibre Channel devices are all connected to a loop Each device is assigned an arbitrated loop physical address AL_PA The FC AL supports 124 devices in a sin...

Страница 77: ...1 Remove the SFP module 1 from its static protective package 2 Remove the dust plug 2 from the SFP transceiver module 3 Insert the SFP module into the system host ports The module will click into pla...

Страница 78: ...2 Host server 2 Data path connection Fault tolerant data paths yet Logical partitions can not failover to a partner controller in the event of controller failure Host channel bandwidth 6400 MB s Above...

Страница 79: ...ID112 LD1 CH0 ID112 CH2 ID112 HBA 1 HBA 0 CH1 ID112 CH0 ID112 HBA 1 HBA 0 CH3 ID112 CH2 ID112 EonPath EonPath Channels Controller A Host CH0 CH1 CH2 CH3 Configuration Information RAID controller 1 Hos...

Страница 80: ...iple data paths to a RAID system a multi path software is necessary e g the EonPath driver The two logical drives in the above drawing cannot leverage the full computer power of the system You may att...

Страница 81: ...BA 0 EonPath HBA 1 HBA 0 HBA 1 HBA 0 CH2 A116 CH3 A116 CH2 B117 CH3 B117 CH2 B118 CH3 B118 CH2 A119 CH3 A119 CH0 A112 CH2 A116 CH0 B114 CH2 B118 CH0 B113 CH2 B117 CH0 A115 CH2 A119 CH1 A112 CH3 A116 C...

Страница 82: ...a single component e g RAID controller HBA cable or FC switch Each logical partition is redundantly mapped to multiple host channel IDs in an AAPP Active Active Passive Passive configuration Logical v...

Страница 83: ...4x 11x 5x 7x 1x Ether net A 12x 6x 8x 2x 9x 3x 10x 4x 11x 5x 7x 1x C 1 2 3 4 5 6 7 8 9 1011 1 2 A B 12x 6x 8x 2x 9x 3x 10x 4x 11x 5x 7x 1x Eth ern et A 12x 6x 8x 2x 9x 3x 10x 4x 11x 5x 7x 1x C Channe...

Страница 84: ...l partition is mapped to a single host channel ID If you prefer path redundancy you can map a logical partition to IDs residing on two different channels You will then need the EonPath driver to manag...

Страница 85: ...than the included one The cables 28AWG x 8 pairs are characterized by 100ohm black colors UL approved lead free 50 120 or 170cm cable lengths connectors can be secured to chassis receptacle using latc...

Страница 86: ...partitions by default 4 SAS port Cluster Configuration Connection For cluster environment configuration in 4 SAS port systems connect the cables as shown below and by using default LUN mapping CH0 A B...

Страница 87: ...es as shown below To map specific partitions P1 P2 P3 P4 to hosts channels please refer to the SANWatch User Manual RAID LV LD LD CH0 AID CH1 AID CH0 AID CH1 BID CH0 AID CH0 BID CH0 AID CH0 AID CH0 AI...

Страница 88: ...ct Attached Storage Connection with Redundant Host Path HBA 1 HBA 0 CH0 BID CH1 BID CH1 AID CH1 AID CH1 BID CH0 AID CH0 BID RAID LV LD LD CH0 AID CH0 AID CH0 AID CH1 AID CH0 AID CH1 BID CH0 AID CH0 BI...

Страница 89: ...r models With more hard drives over the SAS expansion links you can create more logical groups of drives Avail these logical partitions using more LUN numbers NOTE EonPath multi pathing software or Li...

Страница 90: ...Direct Attached Storage Connection to Two Servers CH0 AID CH1 AID CH1 AID CH0 AID LV LD RAID LV LD NOTE If you would like a LUN a logical partition to be accessed by multiple hosts file locking or mu...

Страница 91: ...Directly to iSCSI initiators software or hardware or via Gigabit Ethernet switches To servers equipped with iSCSI HBA preferably a hardware TOE TCP IP Offload Engine card and then to client stations w...

Страница 92: ...orts must be configured into the same subnet Please note the following Use the Ethernet management port for management purposes only i e SANWatch or telnet console This Ethernet management port is not...

Страница 93: ...ent Description RAID system iSCSI RAID managed by redundant RAID controllers with a total of 8 host ports HBA iSCSI initiators preferably PCI E TCP IP offload engine TOE capable cards GbE cables GbE n...

Страница 94: ...CH0 AID and CH0 BID LD assigned to controller A LD1 mapped to CH1 AID and CH1 BID LD assigned to controller A LD2 mapped to CH2 AID and CH2 BID LD assigned to controller B LD3 mapped to CH3 AID and C...

Страница 95: ...witch VLAN1 VLAN2 Component Description RAID system iSCSI RAID managed by a single controller with 4 host ports HBA or NIC iSCSI initiators preferably PCI E TCP IP offload engine TOE capable cards GbE...

Страница 96: ...1 BID Ch2 AID Ch0 AID Ch3 BID EonPath EonPath Component Description RAID system iSCSI RAID managed by redundant RAID controllers with a total of 8 host ports HBA iSCSI initiators preferably PCI E TCP...

Страница 97: ...rollers A and B to enable remote replication LD1 mapped to CH1 BID CH0 AID CH3 BID and CH2 AID LD has to be assigned to both controllers A and B to enable remote replication NOTE In the event of singl...

Страница 98: ...ystem iSCSI RAID managed by redundant RAID controllers with a total of 8 host ports HBA iSCSI initiators preferably PCI E TOE cards GbE cables GbE network cables port trunking indicated by the blue ci...

Страница 99: ...s can be created from drives in JBOD LD0 mapped to CH0 AID and CH1 BID LD has to be assigned to both controllers A and B to enable remote replication LD1 mapped to CH1 BID and CH0 AID LD has to be ass...

Страница 100: ...controller with 4 host ports HBA or NIC iSCSI initiators preferably PCI E TCP IP offload engine TOE capable cards GbE cables GbE network cables port trunking indicated by the red circles Software Eon...

Страница 101: ...l work in their respective speeds It maximizes the number of connections while keeping the optimum performance gained by the high speed FC link and FC switch FC NOTE To gain optimum performance make s...

Страница 102: ...create a volume copy mirror pair for data protection but do not want to rely on slow management LAN cable connections In such case you may link the hybrid systems using iSCSI host ports If the distanc...

Страница 103: ...length please contact your vendor The cable features include 28AWG x 8 pair 100ohm black UL approved lead free 50cm 120cm or 170cm cable lengths and connectors that can be secured to chassis using th...

Страница 104: ...closures For dual controller systems each expansion port connects a RAID controller to a corresponding JBOD controller making fault tolerant links to different SAS domains There are two principles wit...

Страница 105: ...xxx S12S J2000 R X S16F R1xxx S24F R1xxx X S16S J1000 R S16S J1000 R1 S16x R2xxx X S16S J2000 R Dual controller fault tolerant paths S24x R2xxx There is a rotary ID switch on every expansion enclosure...

Страница 106: ...Connection Physical connections from RAID to JBODs C tr l St atus C BM Statu s CH0 CH1 CH2 CH3 IN OUT C tr lSt at us CBM Statu s CH0 CH1 CH2 CH3 C tr lSt at us CBM Statu s CH0 CH1 CH2 CH3 IN IN OUT OU...

Страница 107: ...inishing the JBOD expansion connection A maximum of five 5 2U or 3U JBODs can be connected to RAID systems A maximum of three 3 4U JBODs can be connected to 2U and 3U RAID systems A maximum of two 2 4...

Страница 108: ...g RAID enclosure Make sure a unique ID is configured on each JBOD according to the table so that the SAS WWN addresses of disk drives can be properly assigned RAID system firmware automatically manage...

Страница 109: ...rted interface two phys drive routed across the backplane bo and then interfaced through a 4x wide e be continued in the event of a cable link or SAS JBOD controller failure Designation Description De...

Страница 110: ...h RAID controller can be considered as managing eparate SAS Domain With the help of the port s hanism on MUX SAS Dom applie drives are used in a dual controller JBOD One expansion link connects JBODs...

Страница 111: ...dual controller models a Y cable is provided in the package For single controller models a standard DB9 straight cable should be supplied by the user NOTE null modem may be required if you are using...

Страница 112: ...drive trays whether or not they contain a hard drive have been installed into the system ost or external networking devices nding temperature nce all hard en properl the I O ports manageme Cable conne...

Страница 113: ...atches the power socket and there are clip notches on both sides to hold the plug in place Simply plug To plug and perform the pinch action to release the clip notches on both sides while re is a dumm...

Страница 114: ...ower cord connections 1 Remove p rds and cable clamps from the a y boxes 2 Com ith cable clamp ower co ccessor bine cable strap w 3 Attach cable clamps to the power cords by opening and enwrapping the...

Страница 115: ...S16 S24 Series 5 Adjust the position barb anchor can be so that when a power plug is connected to system power the inserted into the anchor hole above the power socket 2U and 3U RAID models 2U Gxxxx...

Страница 116: ...procedures below 1 Turn on the power switches to the on position for every PSUs power switches from left to right er On Procedure NOTE Make sure all power supply modules switches are turned on 2 Power...

Страница 117: ...and the power on self test may take up to five minutes and the system fault LED may light up duri g the process The system fault LED will turn off after a successful boot up ocess refer to Front Panel...

Страница 118: ...circle On steady green Cooling fan LED indicated by the red circle Off 2UL 2UL C 2U Rxxxx 3U 4U Be s ure every P SU should have thesame mark 3Y 405W Be s ure every P SU should have thesame mark 3Y 405...

Страница 119: ...ing on the RAID system wait for the front panel LCD scr READY or No Host LUN Power On Self Test Please Wait System is performing a self test Power on Init Completed System power on self test is comple...

Страница 120: ...ED for RAID Models on the controller module to check if there is still cached data in the DRAM if the LED is lid up in amber 3 wn Controller ed data using the LCD panel Use the Shutdo function to flus...

Страница 121: ...r the system through the following features Firmware The RAID controller in the system is managed by a rt For more details see the Firmware manual in the CD ROM tor DS se system oring Features pre ins...

Страница 122: ...the CD ROM SANWatch s Notification Manager notifies users or events through email MSN etc Notification Manager LEDs LED indicators notify users of system status events and failures LEDs are located on...

Страница 123: ...N arrow keys to select viewing items In the bottom row of the main menu View and Edit Event Logs the most recent event is displayed ENT button 4 Used for browsing events To see detailed description of...

Страница 124: ...g white indicates that there is active host drive channels traffic on the host drive channels OFF indicates that there is no activity on the 2 BUSY White 3 ATTEN Attention Red Red indicates that a com...

Страница 125: ...Green e d r failure Green indicates that the system is powere properly Amb r Amber indicates that there is a powe in the system 3 Cooling fan Green Green indicates that the cooling fan is operating pr...

Страница 126: ...ndicates that the system has encountered abnormal conditions 6 Rotary ID switch N A Allow users to set enclosure IDs when connected to JBOD expansion enclosure s 7 Mute service button N A Pressing les...

Страница 127: ...side of ea eck the drive tray indicators to find the 1 2 r Status Name Colo 1 Drive Busy Blue Flas or read from the drive The drive is busy OFF indicates that there is no activity on the disk drive hi...

Страница 128: ...C_Dirty Amber Am Cache Memory is dirty Errors occurred with cache memory ECC errors Data is being flushed from flash backup module to drive when power is restored Battery voltage is lower than 2 5V B...

Страница 129: ...ash are present or flash has failed When lit it also OFF means BBU is not installed in a single controller CBM atus Green Amber modules Amber steady on indicates CBM failure meaning either BBU indicat...

Страница 130: ...re validly linked to external d Blinking green indicates one of the 4 PHYs links OFF indicate 2 SAS Speed Green r Green indicates 6Gbps link speed Ambe Amber indicates 3Gbps link speed OFF indicates n...

Страница 131: ...indicates connection established Flashing green indicates data activity 2 Link activity LED Green Off Off indicates connection not established Type II 1 2 Name Status Status Green Green indicates 1Gb...

Страница 132: ...d A r mbe Amber indicates connection established 2 Link activity status LED Flashing O activity Flashing indicates data I 1 4 6 Hybrid iSCSI Ports 1 2 Name Color Status Green Green indicates 1Gb conne...

Страница 133: ...s 1 4 7 10Gb iSCSI Host Port LED LED status Color Status Steady ON Green Steady green indicates a link has been established Flashing Green Flashing green indicates an active link Off Off Off indicates...

Страница 134: ...hannel host ports Each of these ports has two LEDs for displaying the operating status Name Color Status 1 Link Green s Green indicates an established link Off mean a link is broken Green indicates 8G...

Страница 135: ...SAS Link Status d Green OFF in icates all 4 PHYs are offline Green indicates a 6Gbps link Amber indicates a 3Gbps link 2 SAS Speed Status Green Amber icates that there is no connection OFF ind For 4p...

Страница 136: ...o Replacing the Power Supply Module PSU Cooling Module LEDs 1 2 1 PSU Status LED Status Description G T r supply but the power swit reen he system is connected to powe ch has not turned on Flashing On...

Страница 137: ...The power supply has not been turned on The PSU module LED will indicated by the blue arrow blink when the system is connected to a power source but not yet turned on Steady Green The PSU is operatin...

Страница 138: ...g fan is op RED The cooling fan has failed 1 5 2 4U RAID System Cooling Module LED Be sure every PSU should have the same mark 3Y 405W Be sure every PSU should have the same mark 3Y 405W Be sure ever...

Страница 139: ...utton Alarms and I2C Bus ction circuitri If the system administ m and t rectify the pr on the front panel and the Alarm beep pattern is descri he bed in t Troubleshooting Guide included in the CD ROM...

Страница 140: ...tion using the Export NVRAM function on the LCD panel RAID model No Ready Ent View and Edit Logical Drives System Functions Ent Mute Beeper Controller Maintenance Ent Ent Export NVRAM to Export NVRAM...

Страница 141: ...Ent Import NVRAM include password except password Ent Import NVRAM in progress View and Edit Logical Drives System Functions Mute Beeper Import NVRAM from reserve space Export NVRAM to reserve space C...

Страница 142: ...replacements Whe e Forcing or n inserting a removable module do not use excessive forc slamming a module can damage the connector pins either on the module itself or on the backplane The following co...

Страница 143: ...Controller firmwares MUST match so before you replace a controller in a dual re of the operational controller matches the repl state its firmware version with a label on the packaging To find out the...

Страница 144: ...nt Press and hold the Enter Ent button for 2 seconds ter Press the up and down arrow to scroll to the menu you are af 1 Prepare a clean static free work pad or container to place the controller 2 Repl...

Страница 145: ...board edge connectors are engaging the backplane Push the ejection levers upward indicated by the blue arrows and fasten the retention screw on the ejection levers 7 Reattach all the cables 8 For sin...

Страница 146: ...ngs refer to the illustration below may use the following options RAID model No Ready Ent Ent Ent Ent Import NVRAM include password except password Ent Import NVRAM in progress View and Edit Logical D...

Страница 147: ...patible DRAM module Reusing the DRAM module removed from a failed controller is not recommended unless you have a similar RAID system to test its integrity Installing the DIMM Module 1 Remove the cont...

Страница 148: ...to the socket The side clips will close automatically and secure the positions Align the DIMM module with the socket and firmly push th DIMM module into the socket 6 If applicable Reinstall the BBU mo...

Страница 149: ...ent of a power failure the combination of BBU FBM on volatile flash storage can store the data indefinitely n WARNING Make sure you have the replacement module s on hand before you attempt to replace...

Страница 150: ...lied by your distributor Use of battery se of used BBUs at authorized battery disposal sites only t temperature reading exceeding the pre set threshold T circuits will enter a low power and self prote...

Страница 151: ...s Type II controller systems 3 the top cover unscrew For type II controller systems to separate the BBU from the screws shown in the following illustration BBU 4 Install the replacement module and fas...

Страница 152: ...from the FBM 5 Use your finger nails if the FBM does not easily disengage Once disengaged the flash module will pop up You can then remove it from the socket 5 Insert the replacement FBM into the sock...

Страница 153: ...ollowing indicators PSU status LED locations blue circles Replacing the P 2UL 2U Rxxxx 3U 4U B e sure every P S U should have the sam e m ark 3Y 405W B e sure every P S U should have the sam e m ark 3...

Страница 154: ...r an extended period of time The failed spare redundant PSU should be replaced as soon as possible To replace a PSU follow these steps 1 Power off the system turn off the PSU and unplug the power cord...

Страница 155: ...e sides of the handle can snap e to engage the back end connectors Push the handle downwards to secure the module onto the metal anchor pins 2 placed along the interior walls of the PSU slot Push the...

Страница 156: ...connect the PSU from the backplane connectors Once dislodged gently pull the PSU module out of the system If the system is mounted in a rackmount rack use another hand to support its weight while remo...

Страница 157: ...he sides of the handle can snap U wards to secure the module onto the metal anchor pins 2 on the interior walls of the PSU slot Push the PS into chassis and when you feel the contact resistance pull t...

Страница 158: ...e m ark 3Y 405W B e s ure ev ery P S U should have t he sam e m ark 3Y 405W CH0 CH1 CH0 CH1 d gracefully disconnect the PSU from the backplane connectors Once dislodged gently pull the PSU module out...

Страница 159: ...h the PSU onto the metal anchor pins 2 on the interior walls of the PSU slo into chassis and when you feel the contact resistance pull the handle upwards to secure the module Secure the PSU to the sys...

Страница 160: ...tors 2U Rxxxx 3U Be s ure every P SU should have thesame m ark 3Y 405W Be s ure every P SU should have thesame m ark 3Y 405W Be s ure every P SU should have thesame m ark 3Y 405W CH0 CH1 CH0 CH1 4U 2U...

Страница 161: ...enter and then pull the cooling module out of the chassis 2 Install the replacement module by pushing it into the module bay When fully inserted the retention latches will hold the module in place 3 A...

Страница 162: ...the accumulated heat can damage the system 1 Use no one hand to push the retention latch to the side while using a ther hand to hold and pull on the fan module extraction handle 2 Once released from...

Страница 163: ...e Carry them only by the edges and avoid touching their circuits part and interface connectors To replace a hard drive follow these steps 1 Identify the drive tray Use the firmware utility SANWatch or...

Страница 164: ...spring handle will pop out 4 Remove the drive tray Pull the tray one inch away from the enclosure Wait for at least 30 seconds for the disk drive to spin down and then gently withdraw the drive tray f...

Страница 165: ...ose the front bezel 7 Insert the drive tra 8 Lock the drive tray Turn the bezel lock to the vertical orientation locked position using a flat blade screwdriver Do not push the bezel lock while turning...

Страница 166: ...s of the chassis as entioned previously in section Internal Backplane m The internal backplane cont ns logic level and power paths Thermal 2 rd contains no user serviceable components when damaged you...

Страница 167: ...SU 0 lights up RED indicating failure and normally you would order a new PSU to replace the failed one If you have replaced the failed PSU and find that the status LED still lights up RED then there i...

Страница 168: ...running but remember to fill up all module slots after swapping them around empty module slots will interrupt airflow 4 As a faulty backplane board may affect the system in a variety of ways performa...

Страница 169: ...t is a new enclosure you need please order the exact same model s enclosure Important same model enclosure backplane board will have the same embedded license number so it is essential for you to orde...

Страница 170: ...4 Series 10 Once your storage pool has been confirm is indeed back online you may restore your original settings please refer to Replacing System Configurations in the SANWatch User Manual or you can...

Страница 171: ...e SAS SFF 8088 host ports Host Channels Multiple SAS PHYs logically combined into 2 host channels per controller Drive Interface channel Supports 12 16 24 channels of 3 6Gbps SAS or SATA II SATA III S...

Страница 172: ...Intel chipset Hardware XOR Yes Real time Clock ng For event messages with time record and task scheduli Configuration rough the lished network connection ernet Text based firmware embedded utility ove...

Страница 173: ...nclosure Management ia I 2 C interface Yes Automatic Drive Failure Detectio Yes n Automatic Rebuild on Spare Driv Yes es Regenerate Logical Drive Parity Yes Bad Block Reassignment Yes Manual and Autom...

Страница 174: ...to controll 2 er Over temperat e Protection Auto shutdown when lost cooling or exceeded ambient temperature over voltage protection is also ur available PSU specifications described above may not rep...

Страница 175: ...er voltage protection is also available 1 7 2 Dimensi S12 series ons Dimensions Without chassis ears With chassis ears protrusions protrusions Height 88m mm m 89 Width 446mm 481 6mm Length 514mm 531 6...

Страница 176: ...With Altitude 000ft Packaged Sea level to 40 000ft Operating Sea level to 12 Shock Half sine lse width Non operating 15G half sine 11ms pulse width Operating 5G half sine 11ms pu Random Operating 5 t...

Страница 177: ...ut Models Interface S12 16 24F Fibre brid S16S R G2242 4 SAS iSCSI S12 16 24E S12 S16 JBOD S16F Hy Fibre iSCSI S12 16 24S RAID Fibre Host Port GbE Host Port SAS Host Port SAS Expansion Port DB 9 Seria...

Страница 178: ...tion 2 Two wire serial ID interface data line SDA 5 MOD_DEF 1 Module definition 1 Two wire serial ID interface clock line SCL 6 MOD_DEF 0 Module definition 0 Grounded in module module present indicato...

Страница 179: ...EonStor EonStor DS S12 S16 S24 Series 16 VCCT Transmitter power 3 3V 17 V Transmitter ground EET 18 TD Transmitter DATA In 19 TD Inverse Transmitter Data In 20 VEET Transmitter Ground 179...

Страница 180: ...he Mini SAS host ports c F 8088 specification omply with the SF Pin Name Pin Name A1 GND B1 GND A2 RX0 B2 TX0 A3 RX0 B3 TX0 A4 GND B4 GND A5 RX1 B5 TX1 A6 RX1 B6 TX1 A7 GND B7 GND A8 RX2 B8 TX2 A9 RX2...

Страница 181: ...iSCSI Host Port Pin out Pin Name Pin Name 1 BI_DA 5 BI_DC 2 BI_DA 6 BI_DB 3 BI_DB 7 BI_DD 4 BI_DC 8 BI_DD NOTE Automatic MDI MDI X Crossover Crossover mplemented internally at hub or can be i switch...

Страница 182: ...ct 6 DSR1 Data Set Ready 2 RXD1 Receive Data 7 RTS1 Request to Send 3 TXD1 Transmit Data 8 CTS1 Clear to Send 4 DTR1 Data Terminal Ready 9 RI1 Ringing indicator 5 GND Ground The DB 9 to DB9 Y cable co...

Страница 183: ...EonStor EonStor DS S12 S16 S24 Series 1 7 8 Ethernet Management Port Pin Name Pin Name 1 LAN_TXP 5 N2 2 LAN_TXN 6 LAN_RXN 3 LAN_RXP 7 N1 4 N2 8 N1 183...

Страница 184: ...h the SFF 8088 specification SAS SFF 8088 Expansion P RAID Controller JBOD Controller Pin Name Pin Name A1 GND B1 GND A2 RX0 B2 TX0 A3 RX0 B3 TX0 A4 GND B4 GND A5 RX1 B5 TX1 A6 RX1 B6 TX1 A7 GND B7 GN...

Страница 185: ...essory Fibre Host RAID Models e details are shown below Description SFTP CAT5E Ethernet cable Color black Connector 8P8C plug covered by metal shield Cable type roun 4P braided wire OD 6 2mm This shie...

Страница 186: ...1995 A1 2001 A2 2005 EN 55024 1998 A1 2001 A2 2003 IEC 61000 4 2 1995 A2 2000 IEC 61000 4 3 1995 A2 2006 IEC 61000 4 4 2004 IEC 61000 4 5 2005 IEC 61000 4 6 2003 A1 2004 A2 2006 IEC 61000 4 8 1993 A1...

Страница 187: ...ST NOT be metallica connect to the OSP or its aces are designed for use as wiring These interf intra building interfaces on as described in ly Type 2 or Type 4 ports GR 1089 CORE Issue 6 from the expo...

Страница 188: ...stalling the Earth Lead Kit fo Groundi Item Description Quantity A Grounding cable 1 B Ground screw 6 32 1 4 inch with star shaped washer 2 C M5 cage nut 1 Internal diameter Externa A Internal diamete...

Страница 189: ...mmended to install the earth lead kit once the enclosure stalled into the cabinet To install att d cable to the enclosure and secure it with the dedic you power on your system has been in ach one end...

Страница 190: ...he enclosure and cabinet post 2 A supplied 14AWG Gauge wire used for grounding should be indicated also in this section 3 Grounding Kit Contents please refer to the above installation kit and procedur...

Страница 191: ...r to the hardware manual that came with the system for detail installation procedures If you are unable to locate clear instructions on installing your enclosure please contact Technical Support The t...

Страница 192: ...Slide Rail Installation Guide 192 1 8 2 EonStor Series Model Kit 9272 9273 9279 9373 S12F G1842 v S12F R1840 v S12S J1000G v S12S J1002R v S16F series v S16S J1000R S 1 v S24F series v...

Страница 193: ...modules FBM and or BBU after the enclosure has been mounted nti static wristband before nd during the installation procedure d to plug the system into two different po er sources eg into a et and anot...

Страница 194: ...components in the following order 1 Rackmount rails onto the enclosure rack cabinet 2 Enclosure onto the cabinet 3 Hard drives into drive trays 4 Drive trays with or witho 5 If BBU FBM were purchased...

Страница 195: ...below 72CESlide28 0030 IFT 9272CESlide36 0030 The following table shows all accesso IFT 9272CSlider28 36 0010 rackmount rail install enclosures 21 28 5 and 25 5 36 deep racks resp 2 Kit Contents Item...

Страница 196: ...ation of the IFT 9272 rack mount slide rail begins with determ e rack the system will be installed Once determined attach four M5 clip nuts 09 to ach front rack posts and two M5 clip buts to each rear...

Страница 197: ...04 02 Adjust slide rail lengths 3 Fasten two M5 x 10mm truss head screws 06 through the middle two screw holes on the front side of the slide brackets to the middle two clip nuts on the front rack po...

Страница 198: ...ach inner bracket The inner brackets will protrude 75mm from the rear end of the chassis 01 08 Attaching inner brackets 6 Gently lift the subsystem so that the inner brackets 01 on the chassis can be...

Страница 199: ...e the subsystem enclosure in the server rack by fastening two M5 x 30mm pan head screws on each side through the enclosure forearm handle 07 07 Secure screws on side ears of system to finalize 9272CES...

Страница 200: ...kit it is designed for 3U enclosures 24 32 and 26 36 deep racks respectively 1 8 5 IFT 9273 Kit Contents Th Item Description Quantity 01 Left L shape rail 1 02 Right L shape rail 1 03 Extension brack...

Страница 201: ...e rail begins with determining the p u osition where the system is going to be installed Insert clip nuts 07 if your rack has n threaded holes 1 2 3 4 5 6 7 8 9 3U 07 1U 2U 2 Determine the length of t...

Страница 202: ...the slide rail onto the rack 4 Using three flat head screws 09 on each side attach the interline sheet 04 to the back of the enclosure forearm handles 04 09 09 09 Attaching the interline sheet 5 The i...

Страница 203: ...he enclosu onto the slide rails Use two 32 x 12mm flat head screws 09 on each end to secure the 6 At the end of the L re enclosure onto the slide rails 09 Securing the enclosure onto the slide rail 7...

Страница 204: ...IFT 9273CSlide32 36 0100 Slide Rail Kit 10 10 Screws on the forearm securing the enclosure onto the rack 204...

Страница 205: ...installation kit It is designed for 36 deep racks 1 8 7 IFT 9279 Kit Contents Item Description Quantity 01 Rackmount rail assembly right side 1 02 Rackmount rail assembly left side 1 03 Cross recess...

Страница 206: ...indicated by the blue circle sing M5 flathead screws 04 must match on front and rear posts Place two cage uts 06 on the two outer most holes of the front post between the 06 04 04 Rear rac Front rack...

Страница 207: ...IFT 9279CSlider36 Slide Rail Kit R 05 05 07 07 07 07 Attach filler plates to the enclosure 207...

Страница 208: ...ed by the blue arrow and circle on the sides of RAID JBOD enclosures 3 enclosure 55 lb 25 kg Install the enclosure into the rack 4 Secure the enclosure to the front rack posts using four M5x30 cross r...

Страница 209: ...tem Description Quantity 01 Mounting bracket assembly L shape left side 1 02 Mounting bracket assembly L shape right side 1 03 Inner glide 2 04 Screws cross recess round head M5x30 4 05 Cross recess t...

Страница 210: ...ind ed by the b shown in the top view illustration tion Procedure 1 The installation begins e enclo flathead scre rotruding e icat lack arrow is bent inward as Rear of enclosure 07 03 Top view Side v...

Страница 211: ...your enclosure dimensions 05 08 05 2U screw rackmount position 05 08 05 3U screw rackmount position 05 05 4U screw rackmount position 3 When adjusting the slide rail assembly to its appropriate length...

Страница 212: ...rear post and secure the front and rear us runner indicated by the blue arrow and catch latch indicated by the black arrow is to meet with the inner glides ing M5x0 9mm screws 05 Slide Front rack post...

Страница 213: ...to the rack place the enclosure on the installed rails and slide it into the rack until the front ears of the enclosure meets the front rack posts Mounting the enclosure into the rack cabinet 7 Secure...

Страница 214: ...IFT 9373CSlider36 Slide Rail Kit 03 03 Securing the enclosure with screws in the front and rear forearm area 214...

Страница 215: ...Remove the screws from both sides of the enclosure s ears Shown above in step 8 2 Pull the enclosure out until it is stopped by the release latch 3 Use both hands to support the enclosure weight and u...

Страница 216: ...system is in operation Module and drive bays must not be empty They must have a dummy cover plate in l airflow e Allow 18 20cm of clearance space at the rear of the enclosure for ventilation Avoid tou...

Отзывы: